Search
Close this search box.

Los Angeles

Orange County Transportation Authority Transit Security and Operations Center

Orange County Transportation Authority Transit Security and Operations Center

Miyamoto is providing structural engineering services for the two-story, 32,000-square-foot OCTA Transit Security and Operati ons Center facility (TSOC) in Anaheim, CA. Currently, the OCTA is localized at its Garden Grove Annex building. Due to a lack of space and structural and operati onal limitati ons, it is next to impossible for the OCTA to include transit security and operati ons in their functi ons and to meet California’s structural standards. This project will address the future needs and requirements of the OCTA’s operati onal and security functi ons, with structural upgrades and space for expected growth and the additi on of new functi ons. The new headquarters will contain the Emergency Operati ons Center (EOC), Central Communicati ons (Dispatch), Field Operati ons, Informati on Systems, and Security and Emergency Preparedness functi ons. The facility, which will be housed on a 2.9-acre site, will be designed with redundant building systems and increased structural performance criteria—achieved with the implementati on of a structural steel fl oor and roof framing with seismic resistance provided by Buckling-Restrained Braced Frames—to provide for a resilient facility that can support OCTA’s functi ons in the event of an emergency.

Client

Stantec Architecture

Year

2023

Scale

32,000 SF

Location

Anaheim, CA

Orange County Transportation Authority Transit Security and Operations Center

Miyamoto is providing structural engineering services for the two-story, 32,000-square-foot OCTA Transit Security and Operati ons Center facility (TSOC) in Anaheim, CA. Currently, the OCTA is localized at its Garden Grove Annex building. Due to a lack of space and structural and operati onal limitati ons, it is next to impossible for the OCTA to include transit security and operati ons in their functi ons and to meet California’s structural standards. This project will address the future needs and requirements of the OCTA’s operati onal and security functi ons, with structural upgrades and space for expected growth and the additi on of new functi ons. The new headquarters will contain the Emergency Operati ons Center (EOC), Central Communicati ons (Dispatch), Field Operati ons, Informati on Systems, and Security and Emergency Preparedness functi ons. The facility, which will be housed on a 2.9-acre site, will be designed with redundant building systems and increased structural performance criteria—achieved with the implementati on of a structural steel fl oor and roof framing with seismic resistance provided by Buckling-Restrained Braced Frames—to provide for a resilient facility that can support OCTA’s functi ons in the event of an emergency.

Client

Stantec Architecture

Year

2023

Scale

32,000 SF

Location

Anaheim, CA

More Projects

Aviation

LAX TWA Hangar

Los Angeles, CA

The structure is frequently referred to as the TWA hangar and it is located at [..]

View Project

HospitalitySustainability

Miyako Hybrid Hotel

Torrence, CA

The Miyako Hybrid Hotel is an eight-story, 209-room, eco-friendly boutique hotel and spa in Torrance [..]

View Project

CommercialRetail

Ebner and Empire Buildings

Sacramento, CA

The Ebner Building is an integral piece of Old Sacramento history. The original building was [..]

View Project

MEP

Chevron, Building H-LL Global Security Information Center Renovation

San Ramon, CA

The team provided electrical engineering services to convert an existing storage basement into a 24-hour [..]

View Project

EducationSustainability

Miramar College Library and Learning Resource Center

San Diego

The San Diego Miramar College Library and Learning Resource Center serves the campus and community, [..]

View Project

HealthcareLab and Science

Kaiser Dublin Specialty Medical Building and Cancer Center

Dublin, CA

The Kaiser Dublin Specialty Medical Building and Cancer Center—170,000-SF and 30,000-SF, respectively—are the first phase [..]

View Project

Save lives, impact economies.