San Diego

P-2000 Camp Pendleton MCB Mess Hall & Warehouse

P-2000 Camp Pendleton MCB Mess Hall & Warehouse

This project in 62 Area of Camp Pendleton consists of designing and building a new Dining Facility; a new Consolidated Regimental Warehouse; various supporting facilities and utilities; renovating Warehouse #620591; building a new Semper Fit Football Field, as well as a remote motor pool parking lot for the existing Motor T facility; paving a gravel parking area for privately-owned vehicles; and widening the turn from Meuse Argonne Road to Zahn Way, which will be extended and repaved. The security fence enclosure of the Motor T facility will be moved back to allow Zahn Way to continue from east to west and connect with Meuse Argonne Road. A total of nine buildings will be demolished, eight pre-engineered metal building warehouses and the existing dining facility. The Regimental Warehouse shall be designed in accordance with the UFC 4-440-01 Warehouses and Storage Facilities. While the Dining Facility shall be designed in accordance with UFC 4-722-01N Navy and Marine Corps Dining Facilities and all applicable codes and requirements. This project will require sequenced construction and demolition

Team Members

No data was found

Client

Clark Nexsen

Year

2023

Scale

73,191 Square Feet

Location

Camp Pendleton, CA

P-2000 Camp Pendleton MCB Mess Hall & Warehouse

This project in 62 Area of Camp Pendleton consists of designing and building a new Dining Facility; a new Consolidated Regimental Warehouse; various supporting facilities and utilities; renovating Warehouse #620591; building a new Semper Fit Football Field, as well as a remote motor pool parking lot for the existing Motor T facility; paving a gravel parking area for privately-owned vehicles; and widening the turn from Meuse Argonne Road to Zahn Way, which will be extended and repaved. The security fence enclosure of the Motor T facility will be moved back to allow Zahn Way to continue from east to west and connect with Meuse Argonne Road. A total of nine buildings will be demolished, eight pre-engineered metal building warehouses and the existing dining facility. The Regimental Warehouse shall be designed in accordance with the UFC 4-440-01 Warehouses and Storage Facilities. While the Dining Facility shall be designed in accordance with UFC 4-722-01N Navy and Marine Corps Dining Facilities and all applicable codes and requirements. This project will require sequenced construction and demolition

Client

Clark Nexsen

Year

2023

Scale

73,191 Square Feet

Location

Camp Pendleton, CA

More Projects

Retrofit

The Traveler’s Hotel

Sacramento, CA

The Traveler’s Hotel, built in the 1920s, is a 106,000-SF, seven-story, non-ductile, concrete building. In [..]

View Project

Commercial, Hospitality

Washington Family Ranch Expansion

The Washington Family Ranch in Central Oregon is one of 25 Young Life camps in the [..]

View Project

Residential

The Olive Plaza Building

Eugene, OR

The Olive Plaza Building was originally constructed in the 1980s. Miyamoto provided a seismic rehabilitation [..]

View Project

Healthcare

Tri-City Medical Office Building

Carlsbad, CA

The Tri-City Medical Office Building is a three-story, 57,476-SF structure that utilizes a panelized wood [..]

View Project

Education

Fairfield-Suisun Unified School District, Suisun Valley K-8 Library and Administration Building

Fairfield, CA

Miyamoto International provided structural engineering services at the Suisun Valley K-8 school for the new [..]

View Project

Adaptive Reuse, Mixed-use, Residential, Retrofit

The Hotel Woodland

Woodland, CA

The Hotel Woodland, which is included in the National Historic Preservation Registry, was rehabilitated to [..]

View Project

Save lives, impact economies.

We use cookies

We use cookies to improve your experience on this website. You may choose which types of cookies to allow and change your preferences at any time. Disabling cookies may impact your experience on this website. You can learn more by viewing our Cookie Policy.