Panomar

The seismic deficiencies of this 1960s-era, eight-story residential tower, formerly known as “Marina View Towers,” were numerous and severe. When coupled with the region’s high seismicity and bay mud soils, it was considered to be a dangerous building at high risk of collapse during a significant earthquake. Given these facts, Carmel Partners retained Miyamoto to design a seismic upgrade to mitigate this risk and make the building a safer place for residents, while preserving occupant views of the bay. The existing structure was built with what is commonly termed “lift-slab” construction, consisting of large sections of post-tensioned concrete slabs that are cast on the ground-floor slab around built-up steel box columns, hoisted (or “lifted”) up and nominally secured into place, and then interconnected with closure strips. Finally, the building’s lateral force resisting system, consisting of double angle braces in each direction, was welded to steel sections embedded into the lift slabs.

Team Members

No data was found

Client

Carmel Partners

Year

2013-15

Scale

125,000SF

Location

Alameda, CA

Panomar

The seismic deficiencies of this 1960s-era, eight-story residential tower, formerly known as “Marina View Towers,” were numerous and severe. When coupled with the region’s high seismicity and bay mud soils, it was considered to be a dangerous building at high risk of collapse during a significant earthquake. Given these facts, Carmel Partners retained Miyamoto to design a seismic upgrade to mitigate this risk and make the building a safer place for residents, while preserving occupant views of the bay. The existing structure was built with what is commonly termed “lift-slab” construction, consisting of large sections of post-tensioned concrete slabs that are cast on the ground-floor slab around built-up steel box columns, hoisted (or “lifted”) up and nominally secured into place, and then interconnected with closure strips. Finally, the building’s lateral force resisting system, consisting of double angle braces in each direction, was welded to steel sections embedded into the lift slabs.

Client

Carmel Partners

Year

2013-15

Scale

125,000SF

Location

Alameda, CA

More Projects

Aviation, Commercial

John Wayne Airport Maintenance Building, Design Build

Costa Mesa, CA

Miyamoto designed a new maintenance facility for John Wayne Airport. This structure is a 24,882-SF [..]

View Project

Art

LAPD Harbor Division Station & Jail, Art Installation

San Pedro, CA

Part of the LA City Bureau of Engineering Public Arts program, this 40-foot tall, stylized [..]

View Project

Burlingame Park at 410 Airport Blvd Phase 1B

Burlingame, CA

A vacant nine-acre property at 410 Blvd is planned to be turned into a natural [..]

View Project

Education

Peralta Community College Master Plan

Oakland, CA
Berkeley, CA
Bay Area, CA

This Master Plan consists of evaluating more than 40 buildings on five campuses within the [..]

View Project

Industrial, Tilt-Up, Warehouse & Distribution

Prologis Cheyenne Distribution Center

Clark County, NV

Prologis Cheyenne #3 is a 163,000-SF single-story concrete distribution center in Clark County, Nevada built [..]

View Project

Industrial, Tilt-Up, Warehouse & Distribution

Shinmei Rice Bun Factory

West Sacramento, CA

The $10 million Shinmei Co. Ltd. rice bun factory is located in the heart of [..]

View Project

Save lives, impact economies.