Sacramento

Plaza 555

Plaza 555

The property at 555 Capitol Mall consists of several structures connected by a 14-story core tower. In the final days of escrow during the property sale, the South Napa Earthquake occurred, shaking the two office towers and causing significant damage to the upper floors. Coincident to this occurring, the lenders notified the owners that they would be required to maintain earthquake insurance on the property in order to secure the loan. We identified the primary vulnerabilities for the two 1970s-era concrete towers to be soft-story ground floors, non-ductile detailing at the frame columns and two instances of captured columns. The improvements included adding eight viscous dampers at the ground floor of each tower, providing fiber reinforced polymer composite wrap at some ground- and second-floor columns, and providing a gap around the captured columns in order to ensure a more regular, uniform response to earthquakes. The retrofit cost was about $800,000 per building and resulted in a savings of $144,000 a year in earthquake insurance.

Team Members

No data was found

Client

New Legacy 555,
PacWest Office Equities

Year

2014-18

Scale

195,000 x 2 = 350,000 SF

Location

Sacramento, CA

Plaza 555

The property at 555 Capitol Mall consists of several structures connected by a 14-story core tower. In the final days of escrow during the property sale, the South Napa Earthquake occurred, shaking the two office towers and causing significant damage to the upper floors. Coincident to this occurring, the lenders notified the owners that they would be required to maintain earthquake insurance on the property in order to secure the loan. We identified the primary vulnerabilities for the two 1970s-era concrete towers to be soft-story ground floors, non-ductile detailing at the frame columns and two instances of captured columns. The improvements included adding eight viscous dampers at the ground floor of each tower, providing fiber reinforced polymer composite wrap at some ground- and second-floor columns, and providing a gap around the captured columns in order to ensure a more regular, uniform response to earthquakes. The retrofit cost was about $800,000 per building and resulted in a savings of $144,000 a year in earthquake insurance.

Client

New Legacy 555,
PacWest Office Equities

Year

2014-18

Scale

195,000 x 2 = 350,000 SF

Location

Sacramento, CA

More Projects

Commercial

Cutwater Distillery

Miramar, California

The new Cutwater Spirits craft distillery, which is believed to be the largest distillery on [..]

View Project

Transportation

Willowbrook/Rosa Parks Station

Los Angeles, CA

The Willowbrook/Rosa Parks station has the fourth highest volume of ridership in the metro system [..]

View Project

Entertainment, Seismic Rehabilitation

Angelita Lind Stadium 

Patillas, PR

The Angelita Lind Stadium is an important location for the municipality of Patillas. Meant for [..]

View Project

Parking

California State University Sacramento, Parking Structure II

Sacramento, CA

California State University, Sacramento is primarily a commuter school so vertical parking structures met demand [..]

View Project

Residential

Casa Kutcher-Vazquez

Humacao, PR

Miyamoto provided a structural analysis as well as the structural design of this new multi-level [..]

View Project

Parking

C3 Office Parking Structure

Culver City, CA

The C3 parking structure is a new 9-level, 1,010-stall high-rise parking structure designed by Miyamoto [..]

View Project

Save lives, impact economies.