Sacramento

Plaza 555

Plaza 555

The property at 555 Capitol Mall consists of several structures connected by a 14-story core tower. In the final days of escrow during the property sale, the South Napa Earthquake occurred, shaking the two office towers and causing significant damage to the upper floors. Coincident to this occurring, the lenders notified the owners that they would be required to maintain earthquake insurance on the property in order to secure the loan. We identified the primary vulnerabilities for the two 1970s-era concrete towers to be soft-story ground floors, non-ductile detailing at the frame columns and two instances of captured columns. The improvements included adding eight viscous dampers at the ground floor of each tower, providing fiber reinforced polymer composite wrap at some ground- and second-floor columns, and providing a gap around the captured columns in order to ensure a more regular, uniform response to earthquakes. The retrofit cost was about $800,000 per building and resulted in a savings of $144,000 a year in earthquake insurance.

Team Members

No data was found

Client

New Legacy 555,
PacWest Office Equities

Year

2014-18

Scale

195,000 x 2 = 350,000 SF

Location

Sacramento, CA

Plaza 555

The property at 555 Capitol Mall consists of several structures connected by a 14-story core tower. In the final days of escrow during the property sale, the South Napa Earthquake occurred, shaking the two office towers and causing significant damage to the upper floors. Coincident to this occurring, the lenders notified the owners that they would be required to maintain earthquake insurance on the property in order to secure the loan. We identified the primary vulnerabilities for the two 1970s-era concrete towers to be soft-story ground floors, non-ductile detailing at the frame columns and two instances of captured columns. The improvements included adding eight viscous dampers at the ground floor of each tower, providing fiber reinforced polymer composite wrap at some ground- and second-floor columns, and providing a gap around the captured columns in order to ensure a more regular, uniform response to earthquakes. The retrofit cost was about $800,000 per building and resulted in a savings of $144,000 a year in earthquake insurance.

Client

New Legacy 555,
PacWest Office Equities

Year

2014-18

Scale

195,000 x 2 = 350,000 SF

Location

Sacramento, CA

More Projects

Adaptive Reuse, Retrofit

The Hoag On-Demand Care & Innovation Center

Irvine, CA

The Hoag On-Demand Care & Innovation Center is a masterclass example in adaptive reuse. Previously [..]

View Project

Parking

C3 Office Parking Structure

Culver City, CA

The C3 parking structure is a new 9-level, 1,010-stall high-rise parking structure designed by Miyamoto [..]

View Project

Healthcare, Office

Brea Medical Office Building

Brea, CA

Miyamoto International provided structural engineering design services for this four-story, dual lateral system medical office [..]

View Project

Healthcare, Lab and Science

Sutter Gould Medical Foundation Modesto

Modesto, CA

Sutter Gould Medical Foundation is a four-story, 132,600 square foot, steel framed structure. This state-of-the-art [..]

View Project

Retail

Allen Hyundai Dealership Expansion

Laguna Niguel, CA

Founded by Stanley Allen in 1946, on the Pacific Coast Highway in Laguna Beach, California, [..]

View Project

Entertainment, Retail

Plaza Hotel & Casino Carousel Bar

Las Vegas, NV

There are few landmarks as iconic as Plaza Hotel & Casino’s twinkling dome facing Main [..]

View Project

Save lives, impact economies.

what we’re up to

Latest News & Updates

Subscribe to learn about new the latest in engineering news, solutions, and updates.

We care about your data in our privacy policy.