Professional Building

Built in 1917, the five–story, Professional Building stands as one of the largest buildings in downtown Eureka. Located in an earthquake-vulnerable area with poor soil conditions, this unreinforced brick masonry building was in desperate need of a seismic rehabilitation. Using high-performance engineering techniques, the existing interior steel gravity frames were augmented with new slotted bolted friction dampers, thus adding lateral stiffness and energy dissipation capacity for a major seismic event. Utilizing standard structural sections and readily available materials for design of the custom friction dampers, allowed construction of the newly rehabilitated mixed-use facility seismically unsound to be completed on time and within the budget. Architectural features that were also addressed as part of the rehabilitation included the refurbishment of the rooftop cornice and main entrance columns.

Team Members

No data was found

Client

-

Year

2003

Scale

42,700 SF

Location

Eureka, CA

Professional Building

Built in 1917, the five–story, Professional Building stands as one of the largest buildings in downtown Eureka. Located in an earthquake-vulnerable area with poor soil conditions, this unreinforced brick masonry building was in desperate need of a seismic rehabilitation. Using high-performance engineering techniques, the existing interior steel gravity frames were augmented with new slotted bolted friction dampers, thus adding lateral stiffness and energy dissipation capacity for a major seismic event. Utilizing standard structural sections and readily available materials for design of the custom friction dampers, allowed construction of the newly rehabilitated mixed-use facility seismically unsound to be completed on time and within the budget. Architectural features that were also addressed as part of the rehabilitation included the refurbishment of the rooftop cornice and main entrance columns.

Client

-

Year

2003

Scale

42,700 SF

Location

Eureka, CA

More Projects

Commercial

Christ Community Church Multipurpose Room

Carmichael, CA

This new multi-use facility ties into the existing modern style of Christ Community Church, creating [..]

View Project

Healthcare

CareMar Recovery Center 

Newport Beach, CA

CareMar Recovery Center is a new, two-story, state-of-the-art facility set to open in 2028 on [..]

View Project

Commercial, Industrial, Tilt-Up, Warehouse & Distribution

FIRST Park at Ocean Ranch

Oceanside, CA

First Park at Ocean Ranch is a recently completed industrial business park overlooking beautiful Oceanside, [..]

View Project

Industrial, Tilt-Up

Otay Logistics Center

Otay Mesa, CA

Otay Logistics Center is a 15-acre site in San Diego consisting of two industrial buildings. [..]

View Project

Art, Commercial

Monochrome I & II by Nancy Rubin

Beverly Hills, CA

Nancy Rubins transforms industrial, manufactured objects—such as mattresses, appliances, boats—into the building blocks of her [..]

View Project

Residential

Mesa Court Housing

Irvine, CA

Miyamoto International held a structural peer review of three new five-story structures over a podium. [..]

View Project

Save lives, impact economies.

what we’re up to

Latest News & Updates

Subscribe to learn about new the latest in engineering news, solutions, and updates.

We care about your data in our privacy policy.