Search
Close this search box.

Project Wolverine

Miyamoto engineered this 720,000-SF build-to-suit industrial tilt-up for Wolverine Worldwide’s West Coast Distribution Center. Located on 39 acres in Beaumont, California, the design-bid-build project features 7” Ductilecrete slab, which allows for longer spans between control joints, truss moment frames and clearances of 40 feet. The project’s second phase, a 580,000-SF, single-story concrete tilt-up, has yet to be built. Wolverine is a global distributor of major footwear brands, including its trademark work boots. The project is part of the larger Crossroads Logistics Center.

Client

McDonald Property Group

Year

2016

Scale

720,000 SF

Location

Beaumont, CA

Project Wolverine

Miyamoto engineered this 720,000-SF build-to-suit industrial tilt-up for Wolverine Worldwide’s West Coast Distribution Center. Located on 39 acres in Beaumont, California, the design-bid-build project features 7” Ductilecrete slab, which allows for longer spans between control joints, truss moment frames and clearances of 40 feet. The project’s second phase, a 580,000-SF, single-story concrete tilt-up, has yet to be built. Wolverine is a global distributor of major footwear brands, including its trademark work boots. The project is part of the larger Crossroads Logistics Center.

Client

McDonald Property Group

Year

2016

Scale

720,000 SF

Location

Beaumont, CA

More Projects

Residential

Eskaton Placerville Assisted Living Facility

Placerville, CA

A smaller sister facility to the previously completed structure in Roseville, this 64-unit, two-story senior [..]

View Project

CivicDOD/Federal

Foley Federal Building

Las Vegas, NV

Part of the GSA Design Excellence program, the Foley Federal Building conversion in Las Vegas [..]

View Project

AviationRetrofitSeismic Retrofit/Heritage Renovation

LAX Theme Building

Los Angeles, CA

The futuristic LAX Theme Building, a Space Age icon at Los Angeles’ airport, was at [..]

View Project

IndustrialTilt-UpWarehouse & Distribution

Project Wolverine

Beaumont, CA

Miyamoto engineered this 720,000-SF build-to-suit industrial tilt-up for Wolverine Worldwide’s West Coast Distribution Center. Located [..]

View Project

Education

Southwestern College Instructional Complex 1

Chula Vista, CA

The Southwestern College’s Instructional Complex 1 addresses the demand for highly effective general-use instructional space [..]

View Project

OfficeRetrofitTilt-Up

UCDH Rancho Cordova Call Center

Rancho Cordova, CA

To improve the consistency of their customer service throughout their practices, UC Davis Health (UCDH) [..]

View Project

Save lives, impact economies.