Los Angeles

Reno Tahoe Airport ConRAC Parking Garage

Reno Tahoe Airport ConRAC Parking Garage


The Consolidated Rental Car Facility (ConRAC) at Reno-Tahoe International Airport (RNO) is a three-story structure featuring vertical circulation cores; an elevated pedestrian walkway to move customers from the terminal to the rental car garage and throughout the facility; an at-grade quick turnaround area (QTA) for the servicing of vehicles (fueling, vacuuming, washing, and RAC administration); and stacking/storage parking spaces. This facility will replace the current rental car QTA and rental car ready and return spaces on the first level of the existing parking garage. The project is designed to a 20-year planning horizon based on passenger growth.

Client

PGAL Architects

Year

2027

Scale

3 Stories

Location

Reno, NV

Reno Tahoe Airport ConRAC Parking Garage


The Consolidated Rental Car Facility (ConRAC) at Reno-Tahoe International Airport (RNO) is a three-story structure featuring vertical circulation cores; an elevated pedestrian walkway to move customers from the terminal to the rental car garage and throughout the facility; an at-grade quick turnaround area (QTA) for the servicing of vehicles (fueling, vacuuming, washing, and RAC administration); and stacking/storage parking spaces. This facility will replace the current rental car QTA and rental car ready and return spaces on the first level of the existing parking garage. The project is designed to a 20-year planning horizon based on passenger growth.

Client

PGAL Architects

Year

2027

Scale

3 Stories

Location

Reno, NV

More Projects

Adaptive Reuse, Retrofit

Hyatt Place & Hyatt House Adaptive Reuse and Seismic Retrofit

Los Angeles, CA

The dual-branded Hyatt House & Hyatt Place LAX was originally built and designed for office [..]

View Project

Commercial

Golden 1 Credit Union

Sacramento, CA

This six-story office building serves as the World Headquarters for the Golden 1 Credit Union. [..]

View Project

Industrial, Tilt-Up, Warehouse & Distribution

Project Wolverine

Beaumont, CA

Miyamoto engineered this 720,000-SF build-to-suit industrial tilt-up for Wolverine Worldwide’s West Coast Distribution Center. Located [..]

View Project

Retrofit

Renovating Griffith Observatory

Los Angeles, CA

Renovating Griffith Observatory, one of the architectural icons of Los Angeles, was a major feat [..]

View Project

Healthcare

Sutter Health Radiation Oncology Center

Sacramento, CA

The NPC-4 Evaluation of the Sutter Health Radiation Oncology Center consisted of reviewing as-built documentation [..]

View Project

Adaptive Reuse, Mixed-use, Residential, Retrofit

The Hotel Woodland

Woodland, CA

The Hotel Woodland, which is included in the National Historic Preservation Registry, was rehabilitated to [..]

View Project

Save lives, impact economies.

We use cookies

We use cookies to improve your experience on this website. You may choose which types of cookies to allow and change your preferences at any time. Disabling cookies may impact your experience on this website. You can learn more by viewing our Cookie Policy.