San Jose

Robla Elementary School Reconstruction

Robla Elementary School Reconstruction

This reconstruction project modernized the 80-year-old Robla Elementary School and integrated the new facilities seamlessly with the existing campus. Miyamoto’s scope included the modernization of the school’s administrative building into a workspace for counselors, intervention specialists and speech professionals, as well as the construction of a new structure to replace an existing building. The new, two-story, 21,800-SF building houses 12 classrooms, a library and new administrative space. Our structural design accommodated numerous changes in roof slope, diaphragm discontinuities and offset shear walls between the first and second stories. Including work that was outside of our scope, the modernized campus contains a combined total of 23 classrooms along with additional administrative and support spaces in support of District specifications for K-6 facilities.

Team Members

No data was found

Client

SVA Architects

Year

2023

Scale

21,800 SF

Location

Sacramento, CA

Robla Elementary School Reconstruction

This reconstruction project modernized the 80-year-old Robla Elementary School and integrated the new facilities seamlessly with the existing campus. Miyamoto’s scope included the modernization of the school’s administrative building into a workspace for counselors, intervention specialists and speech professionals, as well as the construction of a new structure to replace an existing building. The new, two-story, 21,800-SF building houses 12 classrooms, a library and new administrative space. Our structural design accommodated numerous changes in roof slope, diaphragm discontinuities and offset shear walls between the first and second stories. Including work that was outside of our scope, the modernized campus contains a combined total of 23 classrooms along with additional administrative and support spaces in support of District specifications for K-6 facilities.

Client

SVA Architects

Year

2023

Scale

21,800 SF

Location

Sacramento, CA

More Projects

Mixed-use, Residential

Pearson’s Building

Woodland, CA

This two-story, unreinforced brick masonry building was built in 1875 on downtown Woodland’s historic Main [..]

View Project

Industrial, Tilt-Up, Warehouse & Distribution

FedEx – Hayward

Hayward, CA

This 236,976-SF single-story concrete tilt-up on a 31-acre parcel in Hayward, California is being used [..]

View Project

Education

Ripon Unified School District & Ripon High School CTE Building 

Ripon, CA

This Career Technical Education (CTE) Building at Ripon High School is a new, state-of-the-art education [..]

View Project

DOD/Federal

Aguadilla US Army Reserve Training Center

Ramey Naval Base, Aguadilla, PR

Miyamoto provided structural quality control (QC) inspections as required by the US Army Corps of [..]

View Project

Aviation, Commercial

John Wayne Airport Maintenance Building, Design Build

Costa Mesa, CA

Miyamoto designed a new maintenance facility for John Wayne Airport. This structure is a 24,882-SF [..]

View Project

Education, Seismic Rehabilitation

UCR Chapman Hall Seismic Assessment

Riverside, CA

Miyamoto International performed a seismic evaluation of Chapman Hall, a 2-story concrete building constructed in [..]

View Project

Save lives, impact economies.