Sacramento Memorial Auditorium

Sacramento Memorial Auditorium

As a critical component of the Sacramento Community Center Theater transformation project, renovations to the historic Sacramento Memorial Auditorium were needed to house the center’s Broadway-caliber performances for one season while improvements to the theater’s house and stage take place. Given its listing on the National Historical Register, we carefully balanced upgrades to Memorial Auditorium with the need to avoid disturbance to the character-defining historic fabric of the building and site. Some of these improvements (e.g., site modifications, portable restrooms) are designed as temporary, while others (stage, rigging and audio-visual components) are designed to remain. Site and facility improvements include the addition of a temporary loading dock and cross-over structure to the north of the stage, stage floor reinforcement, new rigging and gallery catwalks, new smoke vents in the fly tower roof, and reinforcement to the proscenium and auditorium ceiling structure to support new light trusses and other suspended audio-visual equipment.

Team Members

No data was found

Client

Architectural Nexus

Year

2018

Scale

109,000SF

Location

Sacramento, CA

Sacramento Memorial Auditorium

As a critical component of the Sacramento Community Center Theater transformation project, renovations to the historic Sacramento Memorial Auditorium were needed to house the center’s Broadway-caliber performances for one season while improvements to the theater’s house and stage take place. Given its listing on the National Historical Register, we carefully balanced upgrades to Memorial Auditorium with the need to avoid disturbance to the character-defining historic fabric of the building and site. Some of these improvements (e.g., site modifications, portable restrooms) are designed as temporary, while others (stage, rigging and audio-visual components) are designed to remain. Site and facility improvements include the addition of a temporary loading dock and cross-over structure to the north of the stage, stage floor reinforcement, new rigging and gallery catwalks, new smoke vents in the fly tower roof, and reinforcement to the proscenium and auditorium ceiling structure to support new light trusses and other suspended audio-visual equipment.

Client

Architectural Nexus

Year

2018

Scale

109,000SF

Location

Sacramento, CA

More Projects

Entertainment

24R Theater Live Music Venue

Sacramento, CA

Miyamoto International is working with Another Planet Entertainment (APE) to bring this new two-story live [..]

View Project

Civic

Los Angeles Police Department Harbor Station and Jail

Los Angeles, CA

The LAPD Harbor Station and Jail complex features a new two-story police station and 16,000-sf [..]

View Project

Transportation

Foothill Transit Irwindale Maintenance & Operations Facilities

Irwindale, CA

For this new bus maintenance and operations facility, Miyamoto used a variety of materials and [..]

View Project

Civic

Pat O’Brien Community and Aquatics Center

Sacramento, CA

In the spring of 2019, the Pat O’Brien Community and Aquatics Center opened to South [..]

View Project

Adaptive Reuse, Mixed-use, Retrofit, Seismic Retrofit/Heritage Renovation

The Stockton

Stockton, CA

The Stockton, originally a 252-room hotel built in 1910 and listed on the National Register [..]

View Project

Industrial, Tilt-Up, Warehouse & Distribution

The Crossings @ 880

Fremont, CA

At nearly 700,000 SF on 40 acres, The Crossings @ 880 is the largest industrial [..]

View Project

Save lives, impact economies.

what we’re up to

Latest News & Updates

Subscribe to learn about new the latest in engineering news, solutions, and updates.

We care about your data in our privacy policy.