Sage Green

Sage Green

As a part of an overall effort to achieve optimal energy efficiency, Miyamoto combined efforts with Green One Construction, the Oregon Department of Energy, and the Energy Trust of Oregon to test the structural sheathing over a rigid insulation lateral system. In acknowledgment of the fact that this system is not a prescriptive lateral system identified in the IRC or IBC, we specified that a rigorous seismic cyclic testing program be implemented which was performed by Oregon State University. As a result of our work combined with others, the system has been approved and is in use for the Net Zero Sage Green project. It was determined that the Ply over foam system was the most economical way to achieve the R33 wall system, a requirement based on the energy modeling.

Team Members

No data was found

Client

Green One Construction.

Year

2010

Scale

-

Location

Portland, OR

Sage Green

As a part of an overall effort to achieve optimal energy efficiency, Miyamoto combined efforts with Green One Construction, the Oregon Department of Energy, and the Energy Trust of Oregon to test the structural sheathing over a rigid insulation lateral system. In acknowledgment of the fact that this system is not a prescriptive lateral system identified in the IRC or IBC, we specified that a rigorous seismic cyclic testing program be implemented which was performed by Oregon State University. As a result of our work combined with others, the system has been approved and is in use for the Net Zero Sage Green project. It was determined that the Ply over foam system was the most economical way to achieve the R33 wall system, a requirement based on the energy modeling.

Client

Green One Construction.

Year

2010

Scale

-

Location

Portland, OR

More Projects

Commercial

Chen Building

Davis, CA

This striking structure in old downtown Davis is a mixture of angles and curves. The [..]

View Project

Education, Seismic Rehabilitation

UCR Chapman Hall Seismic Assessment

Riverside, CA

Miyamoto International performed a seismic evaluation of Chapman Hall, a 2-story concrete building constructed in [..]

View Project

Education, Lab and Science, Retrofit

Bella Vista High School STEM Building

Fair Oaks, CA

Bella Vista High School is adding a new $13 million, 22,000-SF Science, Technology, Engineering and [..]

View Project

Aviation

Miyamoto Earthquake Business Interruption Loss Control Program

Los Angeles

Miyamoto developed a tailored program to determine the existing risk to LAWA from earthquakes. Our [..]

View Project

Education

Napa Hall, CSU Sacramento

Sacramento, CA

Napa Hall is the 34,000-SF home of California State University, Sacramento’s College of Continuing Education. [..]

View Project

Retrofit

Carriger Winery

Sonoma, CA

Miyamoto International performed a structural evaluation and developed seismic retrofit design for this historic barn [..]

View Project

Save lives, impact economies.

what we’re up to

Latest News & Updates

Subscribe to learn about new the latest in engineering news, solutions, and updates.

We care about your data in our privacy policy.