San Francisco

San Francisco Public Utilities Commission

San Francisco Public Utilities Commission

Relocating the division from its existing location at 1990 Newcomb Avenue to 2000 Marin Street. Sitting on an eight-acre property, the new, 405,144-SF campus will house six buildings; the largest of which is the six-story garage with a capacity of 556 cars. Second is the four-story administration building, containing a community hub, shops and an outdoor plaza. The other four buildings will be a machine shop, an auto and carpentry shop and a 40-foot-tall warehouse with a meter shop. The site will also include a backup generator on a concrete pad and a fueling station with two above-ground fuel tanks for diesel and gasoline. Miyamoto prepared the structural design for the project. The four-story administrative building utilizes perimeter buckling-restrained braced (BRB) frames founded on auger cast piles. Three auto/machine shops are designed with a combination of BRB and moment frames on micropiles. The kiosk building consists of CMU units founded on mat slab/footing. We also provided structural assistance and designs for landscaping, architectural site elements and hundreds of special equipment anchorage and support.

Team Members

No data was found

Client

Mark Cavagnero Associates Architects

Year

2028

Scale

405,144 SF

Location

San Francisco, CA

San Francisco Public Utilities Commission

Relocating the division from its existing location at 1990 Newcomb Avenue to 2000 Marin Street. Sitting on an eight-acre property, the new, 405,144-SF campus will house six buildings; the largest of which is the six-story garage with a capacity of 556 cars. Second is the four-story administration building, containing a community hub, shops and an outdoor plaza. The other four buildings will be a machine shop, an auto and carpentry shop and a 40-foot-tall warehouse with a meter shop. The site will also include a backup generator on a concrete pad and a fueling station with two above-ground fuel tanks for diesel and gasoline. Miyamoto prepared the structural design for the project. The four-story administrative building utilizes perimeter buckling-restrained braced (BRB) frames founded on auger cast piles. Three auto/machine shops are designed with a combination of BRB and moment frames on micropiles. The kiosk building consists of CMU units founded on mat slab/footing. We also provided structural assistance and designs for landscaping, architectural site elements and hundreds of special equipment anchorage and support.

Client

Mark Cavagnero Associates Architects

Year

2028

Scale

405,144 SF

Location

San Francisco, CA

More Projects

Commercial, Entertainment, Retail

John Reed DTLA

Los Angeles, CA

John Reed Fitness is a revolutionary fitness chain owned by the RSG Group. What makes [..]

View Project

Aviation

Regional Intermodal Transportation Center

Burbank, CA

Within the scope of the Regional Intermodal Transportation Center, Miyamoto International was responsible for designing [..]

View Project

High-Rise, Residential, Retail

Vermont Corridor

Los Angeles, CA

The County of Los Angeles has invited private developers to a Public-Private-Partnership competition to relocate [..]

View Project

Commercial, High-Rise, Retail

California Plaza

Los Angeles, CA

California Plaza is a mixed-use office/retail/entertainment complex constructed on a steep hillside atop Bunker Hill [..]

View Project

Transportation

The Mobility Hub at LTCC

South Lake Tahoe, CA

The Mobility Hub at LTCC is part of a broader plan to bring clean transportation [..]

View Project

Civic

Grass Valley Fire Station No.1

Grass Valley, CA

Miyamoto completed the renovation of an existing 1-story, Fire Station, including a 1-story, 560-SF addition. [..]

View Project

Save lives, impact economies.