Search
Close this search box.
Search
Close this search box.

San Francisco

San Francisco Public Utilities Commission

San Francisco Public Utilities Commission

Relocating the division from its existing location at 1990 Newcomb Avenue to 2000 Marin Street. Sitting on an eight-acre property, the new, 405,144-SF campus will house six buildings; the largest of which is the six-story garage with a capacity of 556 cars. Second is the four-story administration building, containing a community hub, shops and an outdoor plaza. The other four buildings will be a machine shop, an auto and carpentry shop and a 40-foot-tall warehouse with a meter shop. The site will also include a backup generator on a concrete pad and a fueling station with two above-ground fuel tanks for diesel and gasoline. Miyamoto prepared the structural design for the project. The four-story administrative building utilizes perimeter buckling-restrained braced (BRB) frames founded on auger cast piles. Three auto/machine shops are designed with a combination of BRB and moment frames on micropiles. The kiosk building consists of CMU units founded on mat slab/footing. We also provided structural assistance and designs for landscaping, architectural site elements and hundreds of special equipment anchorage and support.

Team Members

No data was found

Client

Mark Cavagnero Associates Architects

Year

2028

Scale

405,144 SF

Location

San Francisco, CA

San Francisco Public Utilities Commission

Relocating the division from its existing location at 1990 Newcomb Avenue to 2000 Marin Street. Sitting on an eight-acre property, the new, 405,144-SF campus will house six buildings; the largest of which is the six-story garage with a capacity of 556 cars. Second is the four-story administration building, containing a community hub, shops and an outdoor plaza. The other four buildings will be a machine shop, an auto and carpentry shop and a 40-foot-tall warehouse with a meter shop. The site will also include a backup generator on a concrete pad and a fueling station with two above-ground fuel tanks for diesel and gasoline. Miyamoto prepared the structural design for the project. The four-story administrative building utilizes perimeter buckling-restrained braced (BRB) frames founded on auger cast piles. Three auto/machine shops are designed with a combination of BRB and moment frames on micropiles. The kiosk building consists of CMU units founded on mat slab/footing. We also provided structural assistance and designs for landscaping, architectural site elements and hundreds of special equipment anchorage and support.

Client

Mark Cavagnero Associates Architects

Year

2028

Scale

405,144 SF

Location

San Francisco, CA

More Projects

Mixed-use, Retail

MARRS (Midtown Arts Retail Restaurant Scene)

Sacramento, CA

MARRS (Midtown Arts Retail Restaurant Scene) is a mixed-use development located in the beautiful Midtown [..]

View Project

Healthcare, Lab and Science

Kaiser Dublin Specialty Medical Building and Cancer Center

Dublin, CA

The Kaiser Dublin Specialty Medical Building and Cancer Center—170,000-SF and 30,000-SF, respectively—are the first phase [..]

View Project

Tilt-Up

MDC Beaumont Bldg 1

Beaumont, CA

MDC Beaumont Bldg 1 is a 1.78-Million-SF tilt-up warehouse in Beaumont, CA. Sitting on 97.5 [..]

View Project

Art

Public Work by Peter Shire Wilshire Blvd/Home Depot

Los Angeles, CA

Peter Shire’s work called Public Work, demonstrates the convergence of 20th Century architecture and art [..]

View Project

Industrial

Good Eggs Tenant Improvement

Oakland, CA

Miyamoto provided tenant improvement services to an existing tilt-up building owned by a grocery delivery [..]

View Project

Commercial, Mixed-use, Residential

2433 Birkdale Street

Los Angeles, CA

The multi-family project at 2433 Birkdale Street is the construction of a new 37,000-SF, 2-story, [..]

View Project

Save lives, impact economies.