In 2024, the San Leandro Unified School District welcomed this new, $67-million gymnasium in San Leandro High School. This 50,000-SF gym provides students with competition, physical education and supplemental activity spaces, a lobby, locker room facilities and support spaces.
Miyamoto’s structural design utilizes structural steel frame construction with an expressive touch at the gymnasium portion with exposed structural steel. The lateral system is composed of buckling-restrained braced frames, and the monumental canopy entrance structure is supported by a cantilever column system.
PBK Architects
2024
50,000 SF
San Leandro, CA
In 2024, the San Leandro Unified School District welcomed this new, $67-million gymnasium in San Leandro High School. This 50,000-SF gym provides students with competition, physical education and supplemental activity spaces, a lobby, locker room facilities and support spaces.
Miyamoto’s structural design utilizes structural steel frame construction with an expressive touch at the gymnasium portion with exposed structural steel. The lateral system is composed of buckling-restrained braced frames, and the monumental canopy entrance structure is supported by a cantilever column system.
PBK Architects
2024
50,000 SF
San Leandro, CA
We use cookies to improve your experience on this website. You may choose which types of cookies to allow and change your preferences at any time. Disabling cookies may impact your experience on this website. You can learn more by viewing our Cookie Policy.