Santa Clarita City Hall

Santa Clarita City Hall

The seismic retrofit of the existing 1980s, three-story Santa Clarita City Hall included the installation of 28 fluid viscous dampers, which significantly reduced the duration of construction and greatly reduces the risk of damage during a seismic event.  The existing building was constructed with pre-Northridge moment frame connections. The seismic retrofit was designed to ensure the building is operational after an earthquake, which is especially important because the building is home to the city’s emergency operations center. During the design stage, close coordination between the design team and the City of Santa Clarita was key to developing temporary space to house impacted staff and to minimize disruption to operations and functions in the fully functioning City Hall building. Construction and project administration occurred off hours and was phased to allow continuous operation throughout construction.

Team Members

No data was found

Client

-

Year

2014

Scale

73,000 SF

Location

Santa Clarita, California

Santa Clarita City Hall

The seismic retrofit of the existing 1980s, three-story Santa Clarita City Hall included the installation of 28 fluid viscous dampers, which significantly reduced the duration of construction and greatly reduces the risk of damage during a seismic event.  The existing building was constructed with pre-Northridge moment frame connections. The seismic retrofit was designed to ensure the building is operational after an earthquake, which is especially important because the building is home to the city’s emergency operations center. During the design stage, close coordination between the design team and the City of Santa Clarita was key to developing temporary space to house impacted staff and to minimize disruption to operations and functions in the fully functioning City Hall building. Construction and project administration occurred off hours and was phased to allow continuous operation throughout construction.

Client

-

Year

2014

Scale

73,000 SF

Location

Santa Clarita, California

More Projects

Industrial, Tilt-Up

Tesla 3912 Calle Fortunada Tenant Improvement

San Diego, CA

Containing a 56,000-SF warehouse and two 985-SF mechanical yards, this tenant improvement project at 3912 [..]

View Project

Healthcare

Sutter Medical Foundation Stockton Medical Offices

Stockton, California

The Sutter Medical Foundation Stockton Medical Campus includes four buildings totaling more than 164,000 square [..]

View Project

Lab and Science

UCI Biological Sciences Building Unit 3

Irvine, CA

As part of a design-build competition, the Biological Sciences Building Unit 3 is a new [..]

View Project

Art

Chris Burden “Urban Light”

Los Angeles, CA

The Chris Burden “Urban Light” art installation consists of 202 vintage light posts from Los [..]

View Project

Aviation

LAX TWA Hangar

Los Angeles, CA

The structure is frequently referred to as the TWA hangar and it is located at [..]

View Project

Industrial

JFC Distribution Center

Commerce, CA

Miyamoto provided structural engineering for the conversion of this existing 190,000-SF warehouse in Commerce to [..]

View Project

Save lives, impact economies.

We use cookies

We use cookies to improve your experience on this website. You may choose which types of cookies to allow and change your preferences at any time. Disabling cookies may impact your experience on this website. You can learn more by viewing our Cookie Policy.