Search
Close this search box.

Orange County

Santa Clarita City Hall

Santa Clarita City Hall

The seismic retrofit of the existing 1980s, three-story Santa Clarita City Hall included the installation of 28 fluid viscous dampers, which significantly reduced the duration of construction and greatly reduces the risk of damage during a seismic event.  The existing building was constructed with pre-Northridge moment frame connections. The seismic retrofit was designed to ensure the building is operational after an earthquake, which is especially important because the building is home to the city’s emergency operations center. During the design stage, close coordination between the design team and the City of Santa Clarita was key to developing temporary space to house impacted staff and to minimize disruption to operations and functions in the fully functioning City Hall building. Construction and project administration occurred off hours and was phased to allow continuous operation throughout construction.

Client

-

Year

2014

Scale

73,000 SF

Location

Santa Clarita, California

Santa Clarita City Hall

The seismic retrofit of the existing 1980s, three-story Santa Clarita City Hall included the installation of 28 fluid viscous dampers, which significantly reduced the duration of construction and greatly reduces the risk of damage during a seismic event.  The existing building was constructed with pre-Northridge moment frame connections. The seismic retrofit was designed to ensure the building is operational after an earthquake, which is especially important because the building is home to the city’s emergency operations center. During the design stage, close coordination between the design team and the City of Santa Clarita was key to developing temporary space to house impacted staff and to minimize disruption to operations and functions in the fully functioning City Hall building. Construction and project administration occurred off hours and was phased to allow continuous operation throughout construction.

Client

-

Year

2014

Scale

73,000 SF

Location

Santa Clarita, California

More Projects

Mixed-useResidential

6041 Variel Avenue

Woodland Hills, CA

This project consists of two phases. The first phase is a 7-story mixed-use development, including [..]

View Project

High-Rise

LinkedIn Headquarters

San Francisco, CA

Recently completed with Gensler, this 26-story offi ce tower is the San Francisco headquarters for [..]

View Project

IndustrialMarineTurkey

Yonca Onuk Shipyard

Yonca Onuk Shipyard in Turkey required a detailed assessment and feasibility study for the rehabilitation [..]

View Project

BridgesCommercial

Bob Hope Airport, Regional Intermodal Transportation Center, Elevated Walkway

Burbank, CA

Miyamoto International was the PGAL (Prime) design structural engineer for Bob Hope Airport’s Regional Intermodal [..]

View Project

OfficeRetrofit

One Capitol Mall

Sacramento, CA

The beautiful One Capitol Mall, bedecked with marble and bronze, was originally built in 1993. [..]

View Project

High-Rise

Grand Shamaya (Phase 1)

Surabaya, Indonesia

The 150,000 sqm. development is a high specification residential towers in Surabaya, Indonesia. Phase 1 [..]

View Project

Save lives, impact economies.