The seismic retrofit of the existing 1980s, three-story Santa Clarita City Hall included the installation of 28 fluid viscous dampers, which significantly reduced the duration of construction and greatly reduces the risk of damage during a seismic event.  The existing building was constructed with pre-Northridge moment frame connections. The seismic retrofit was designed to ensure the building is operational after an earthquake, which is especially important because the building is home to the city’s emergency operations center. During the design stage, close coordination between the design team and the City of Santa Clarita was key to developing temporary space to house impacted staff and to minimize disruption to operations and functions in the fully functioning City Hall building. Construction and project administration occurred off hours and was phased to allow continuous operation throughout construction.

Team Members

No data was found

Client

-

Year

2014

Scale

73,000 SF

Location

Santa Clarita, California

Santa Clarita City Hall

The seismic retrofit of the existing 1980s, three-story Santa Clarita City Hall included the installation of 28 fluid viscous dampers, which significantly reduced the duration of construction and greatly reduces the risk of damage during a seismic event.  The existing building was constructed with pre-Northridge moment frame connections. The seismic retrofit was designed to ensure the building is operational after an earthquake, which is especially important because the building is home to the city’s emergency operations center. During the design stage, close coordination between the design team and the City of Santa Clarita was key to developing temporary space to house impacted staff and to minimize disruption to operations and functions in the fully functioning City Hall building. Construction and project administration occurred off hours and was phased to allow continuous operation throughout construction.

Client

-

Year

2014

Scale

73,000 SF

Location

Santa Clarita, California

More Projects

Lab and Science

Briggsmore Specialty Center

Modesto, CA

Briggsmore Specialty Center houses specialists in cardiology, general surgery, gastroenterology, obstetrics and gynecology, and orthopedics. [..]

View Project

Adaptive Reuse

USC Fire Station No. 15 Relocation

Los Angeles, CA

Miyamoto International worked with the USC to provide design consulting services for the relocation of [..]

View Project

Education, Residential

Loyola Marymount University Student Housing

Los Angeles, CA

The new Loyola Marymount student housing project, with a construction cost of $57M, had two [..]

View Project

High-Rise

CalSTRS

Sacramento, CA

This 15-story office tower rises above two levels of public space along the historic Sacramento [..]

View Project

Residential

1315 Fairlawn Way Residence

Pasadena, CA

The Pasadena Residence is a new single-family, upscale home located on the impressive Pasadena hillside [..]

View Project

Transportation

Advanced Conceptual Engineering phase of the Torrance Transit Park and Ride Regional Terminal

Torrance, CA

Miyamoto provided structural engineering for the Advanced Conceptual Engineering phase of the Torrance Transit Park [..]

View Project

Save lives, impact economies.