The Çorum Public Hospital (with 650-bed capacity) was designed as a seismically isolated reinforced concrete structure. The complex is composed of 13 unit blocks connected to each other on the same diaphragm. The project included a site-specific seismic hazard analysis and a seismic isolation system design for (LRB type) 741 ea isolators. The scope of services also included accompanying the isolator prototype tests and consulting in the Structural Health Monitoring System configuration.
BTC Construction
2016
102,000 m2
Çorum, Turkey
The Çorum Public Hospital (with 650-bed capacity) was designed as a seismically isolated reinforced concrete structure. The complex is composed of 13 unit blocks connected to each other on the same diaphragm. The project included a site-specific seismic hazard analysis and a seismic isolation system design for (LRB type) 741 ea isolators. The scope of services also included accompanying the isolator prototype tests and consulting in the Structural Health Monitoring System configuration.
BTC Construction
2016
102,000 m2
Çorum, Turkey
We use cookies to improve your experience on this website. You may choose which types of cookies to allow and change your preferences at any time. Disabling cookies may impact your experience on this website. You can learn more by viewing our Cookie Policy.