Seismic Reinforcement Project for First Bosphorus Bridge Approach Viaducts

Seismic Reinforcement Project for First Bosphorus Bridge Approach Viaducts

These viaducts were as important as the bridge itself since they connect the bridge to the No.1 Peripheral Road. Built in 1973, these viaducts had also suffered the corrosive effects of time and therefore need to be retrofitted. The reinforcement project was finished in 2008 and now these viaducts are capable of withstanding the earthquake which is expected to take place in a few decades. Services provided by Miyamoto Turkey included quality control, project management, construction supervision services, the rearrangement of design and erection documents according to local conditions for installation of a falling-down prevention device, replacement of the elastomer bearing, replacement of an expansion joint and the replacement of bearings.

Client

IHI Corporation

Year

-

Scale

225 m and 231 m long, 33.4m wide, steel box girder viaducts

Location

Istanbul, Turkey

Seismic Reinforcement Project for First Bosphorus Bridge Approach Viaducts

These viaducts were as important as the bridge itself since they connect the bridge to the No.1 Peripheral Road. Built in 1973, these viaducts had also suffered the corrosive effects of time and therefore need to be retrofitted. The reinforcement project was finished in 2008 and now these viaducts are capable of withstanding the earthquake which is expected to take place in a few decades. Services provided by Miyamoto Turkey included quality control, project management, construction supervision services, the rearrangement of design and erection documents according to local conditions for installation of a falling-down prevention device, replacement of the elastomer bearing, replacement of an expansion joint and the replacement of bearings.

Client

IHI Corporation

Year

-

Scale

225 m and 231 m long, 33.4m wide, steel box girder viaducts

Location

Istanbul, Turkey

More Projects

OfficeRetrofitTilt-Up

UCDH Rancho Cordova Call Center

Rancho Cordova, CA

To improve the consistency of their customer service throughout their practices, UC Davis Health (UCDH) [..]

View Project

Civic

Grass Valley Fire Station No.1

Grass Valley, CA

Miyamoto completed the renovation of an existing 1-story, Fire Station, including a 1-story, 560-SF addition. [..]

View Project

Adaptive ReuseHospitalityOfficeParkingTilt-Up

3333 & 3407 Casitas Atwater Village Adaptive Reuse

Los Angeles, CA

Creatives deserve a creative workspace and environment, and what inspires the mind more than taking [..]

View Project

Commercial

Christ Community Church Multipurpose Room

Carmichael, CA

This new multi-use facility ties into the existing modern style of Christ Community Church, creating [..]

View Project

CommercialMixed-useResidential

City View @ Van Ness

Fresno, CA

City View @ Van Ness is a mixed-use, affordable housing project aimed at young professionals [..]

View Project

Miyamoto Protek

Catholic Relief Services Turkey Earthquake Response

Gaziantep, Turkey

The CRS Turkey Earthquake Response project aims to provide rapid and sustainable emergency shelter solutions [..]

View Project

Save lives, impact economies.