Search
Close this search box.

Seismic Reinforcement Project for New Golden Horn Bridge (A,B)

Seismic Reinforcement Project for New Golden Horn Bridge (A,B)

The New Golden Horn Bridge was built in 1998 to reduce the traffic load of the Old Golden Horn Bridge. As this bridge forms a crucial connection for Circular Road (Çevreyolu/E5), its importance would be even greater in case of an emergency situation in Istanbul. Services provided by Miyamoto Turkey included quality control, project management, construction supervision services, the rearrangement of design and erection documents according to local conditions for reinforcement of piers, replacement of the elastomer bearing and an expansion joint, installation of falling-down prevention device and a transverse displacement restriction device and the expansion of pier foundations.

Client

IHI Corporation

Year

-

Scale

822.2 m long, 11 m wide, steel box girder highway bridges

Location

Istanbul, Turkey

Seismic Reinforcement Project for New Golden Horn Bridge (A,B)

The New Golden Horn Bridge was built in 1998 to reduce the traffic load of the Old Golden Horn Bridge. As this bridge forms a crucial connection for Circular Road (Çevreyolu/E5), its importance would be even greater in case of an emergency situation in Istanbul. Services provided by Miyamoto Turkey included quality control, project management, construction supervision services, the rearrangement of design and erection documents according to local conditions for reinforcement of piers, replacement of the elastomer bearing and an expansion joint, installation of falling-down prevention device and a transverse displacement restriction device and the expansion of pier foundations.

Client

IHI Corporation

Year

-

Scale

822.2 m long, 11 m wide, steel box girder highway bridges

Location

Istanbul, Turkey

More Projects

CivicEducation

Northridge Library

Northridge, CA

This library is a 13,000 square foot replacement library for the Northridge community. The building [..]

View Project

Industrial

Universal Technical Institute (UTI) Sacramento

Sacramento, CA

Miyamoto provided structural design services to the Universal Technical Institute (UTI) in Sacramento, a national [..]

View Project

Industrial

Matahari Terbit Jewelry Factory & Campus Expansion

Bandung, Indonesia

When Matahari Terbit expanded its jewelry manufacturing operations onto adjacent land, it called on Miyamoto [..]

View Project

Residential

Welbrook Southbay Assisted Living and Memory Care

Torrance, CA

Miyamoto International provided structural engineering services for the Welbrook Southbay Assisted Living and Memory Care [..]

View Project

Adaptive ReuseHospitalityOfficeParkingTilt-Up

3333 & 3407 Casitas Atwater Village Adaptive Reuse

Los Angeles, CA

Creatives deserve a creative workspace and environment, and what inspires the mind more than taking [..]

View Project

IndustrialTilt-UpWarehouse & Distribution

Shinmei Rice Bun Factory

West Sacramento, CA

The $10 million Shinmei Co. Ltd. rice bun factory is located in the heart of [..]

View Project

Save lives, impact economies.