Seismic Reinforcement Project for Old Golden Horn Bridge

Seismic Reinforcement Project for Old Golden Horn Bridge

The Old Golden Horn Bridge was built in 1974 and it formed part of a long-distance expressway network connecting Asia and Europe. At the same time, it played an important role in connecting the old city and new city of Istanbul. Increased traffic volume and vehicle weight caused damage on the members of the bridge and made them vulnerable against the expected earthquake in the Marmara region. Services provided by Miyamoto Turkey included quality control, project management, construction supervision services, the rearrangement of design and erection documents according to local conditions for reinforcement of piers and beams, replacement of the elastomer bearing, installation of a falling-down prevention device and a transverse displacement restriction device, replacement of expansion joint and the expansion of pier foundations.

Team Members

No data was found

Client

IHI Corporation

Year

-

Scale

822,2 m long, 31,2 m wide, continuous steel girder with orthotropic slab highway bridge

Location

Istanbul, Turkey

Seismic Reinforcement Project for Old Golden Horn Bridge

The Old Golden Horn Bridge was built in 1974 and it formed part of a long-distance expressway network connecting Asia and Europe. At the same time, it played an important role in connecting the old city and new city of Istanbul. Increased traffic volume and vehicle weight caused damage on the members of the bridge and made them vulnerable against the expected earthquake in the Marmara region. Services provided by Miyamoto Turkey included quality control, project management, construction supervision services, the rearrangement of design and erection documents according to local conditions for reinforcement of piers and beams, replacement of the elastomer bearing, installation of a falling-down prevention device and a transverse displacement restriction device, replacement of expansion joint and the expansion of pier foundations.

Client

IHI Corporation

Year

-

Scale

822,2 m long, 31,2 m wide, continuous steel girder with orthotropic slab highway bridge

Location

Istanbul, Turkey

More Projects

Transportation

Port of San Diego Earthquake Risk Assessment

San Diego, CA

Miyamoto provided a seismic risk assessment of selected Unified Port of San Diego properties located [..]

View Project

Parking

Standard Works Parking Garage

El Segundo, CA

The Standard Works parking structure is a new four-level, 398 space, Type I-A parking garage [..]

View Project

Adaptive Reuse

The DIGGS

Sacramento, CA

The DIGGS is an adaptive reuse project that converts the long-vacant, historic Thomson-Diggs industrial/office building [..]

View Project

Lab and Science

Adventist Health Medical Plaza

Dinuba, CA

Miyamoto International provided design services for this 7,500-SF ambulatory care center in Dinuba. Our goal [..]

View Project

Healthcare

Sutter Medical Foundation Stockton Medical Offices

Stockton, California

The Sutter Medical Foundation Stockton Medical Campus includes four buildings totaling more than 164,000 square [..]

View Project

Aviation, Commercial

John Wayne Airport Maintenance Building, Design Build

Costa Mesa, CA

Miyamoto designed a new maintenance facility for John Wayne Airport. This structure is a 24,882-SF [..]

View Project

Save lives, impact economies.