The V409 viaduct was built using precast t-beams similar to the V408 viaduct. This viaduct was 360 m long and 31 m wide. Both V408 and V409 viaducts were located on the Europe side of Istanbul and act as an extension to the First Bosphorus Bridge. Services provided by Miyamoto Turkey included quality control, project management, construction supervision services, rearrangement of design and erection documents according to local conditions for reinforcement of piers, replacement of the elastomer bearing and an expansion joint, installation of a falling-down prevention device and a transverse displacement restriction device, and the expansion of pier foundations.

Client

IHI Corporation

Year

-

Scale

360 m long, 31 m wide, precast T-beam girder viaduct

Location

Istanbul, Turkey

Seismic Reinforcement Project for Ortaköy Viaduct (V409)

The V409 viaduct was built using precast t-beams similar to the V408 viaduct. This viaduct was 360 m long and 31 m wide. Both V408 and V409 viaducts were located on the Europe side of Istanbul and act as an extension to the First Bosphorus Bridge. Services provided by Miyamoto Turkey included quality control, project management, construction supervision services, rearrangement of design and erection documents according to local conditions for reinforcement of piers, replacement of the elastomer bearing and an expansion joint, installation of a falling-down prevention device and a transverse displacement restriction device, and the expansion of pier foundations.

Client

IHI Corporation

Year

-

Scale

360 m long, 31 m wide, precast T-beam girder viaduct

Location

Istanbul, Turkey

More Projects

Retail

San Francisco Public Utilities Commission

San Francisco, CA

Relocating the division from its existing location at 1990 Newcomb Avenue to 2000 Marin Street. [..]

View Project

Lab and Science

University of California, Irvine, Medical Center Replacement Hospital, Phases 1 and 2

Torrance, CA

Miyamoto provided structural peer review services for the bridging and construction documents of this design-build [..]

View Project

Lab and Science

Integrated Care Center Huntington Beach

Huntington Beach, CA

The new Integrated Care Center was initiated by Hoag Medical Group to create a more [..]

View Project

Residential

Lewis & Clark College Residence Hall

Portland, OR

Miyamoto provided structural engineering services for this 169-bed residence hall that serves both graduate and [..]

View Project

Education

Perris High School Agricultural Center for Excellence

Perris, CA

Miyamoto completed the structural design of this large classroom building for the agricultural program at [..]

View Project

Lab and Science

UCI Biological Sciences Building Unit 3

Irvine, CA

As part of a design-build competition, the Biological Sciences Building Unit 3 is a new [..]

View Project

Save lives, impact economies.