Sacramento

Shasta Executive Plaza GSA Seismic Assessment

Shasta Executive Plaza GSA Seismic Assessment

The existingbuildinghad a steel-framed structure with truss moment frames in each direction, designed per the 1982 Uniform BuildingCode. The evaluation was conducted usinga three-dimensional fi nite element model built usingETABS. A Tier 3 evaluation was performed usingthe ASCE 41 Linear Dynamic Procedure and evaluated for Life Safety (LS) performance at a BSE-1E hazard level (20%/50 years). The analysis results indicated the buildingstructure generally met this performance objective, except for the connections of the moment truss bott om chords to the column webs at the second and third-fl oor levels, which required connection upgrades. Based on these fi ndings and the implementation of these connection upgrades, the buildingwas made compliant with the GSA seismic safety standards.

Team Members

No data was found

Client

Shasta Executive Plaza, LLC

Year

2018

Scale

61,180 SF

Location

Redding, CA

Shasta Executive Plaza GSA Seismic Assessment

The existingbuildinghad a steel-framed structure with truss moment frames in each direction, designed per the 1982 Uniform BuildingCode. The evaluation was conducted usinga three-dimensional fi nite element model built usingETABS. A Tier 3 evaluation was performed usingthe ASCE 41 Linear Dynamic Procedure and evaluated for Life Safety (LS) performance at a BSE-1E hazard level (20%/50 years). The analysis results indicated the buildingstructure generally met this performance objective, except for the connections of the moment truss bott om chords to the column webs at the second and third-fl oor levels, which required connection upgrades. Based on these fi ndings and the implementation of these connection upgrades, the buildingwas made compliant with the GSA seismic safety standards.

Client

Shasta Executive Plaza, LLC

Year

2018

Scale

61,180 SF

Location

Redding, CA

More Projects

Industrial, Tilt-Up, Warehouse & Distribution

Midpoint @ 237

San Jose, CA

Midpoint@237 is a 57-acre, LEED-certified project in San Jose’s Alviso district. The property is designed [..]

View Project

Healthcare

Riverside University Health System Behavioral Health Campus

Mead Valley, CA

The Wellness Village is a medical campus that aims to transform healthcare by integrating behavioral [..]

View Project

Education

San Jose City College Career Education Complex

San Jose, CA

Miyamoto International collaborated with Steinberg Hart & Flint Builders on the new Career Education Complex [..]

View Project

Lab and Science, Sustainability, Tilt-Up

University of California San Diego, East Campus Medical Office Building

San Diego, CA

At approximately 75,000 SF, this University of California, San Diego Office building is a three-story, [..]

View Project

MEP

Chevron, Building H-LL Global Security Information Center Renovation

San Ramon, CA

The team provided electrical engineering services to convert an existing storage basement into a 24-hour [..]

View Project

Residential

Casa Candina

San Juan, PR

Casa Candina is an upcoming 22-story luxury residential tower in Condado, Puerto Rico. Miyamoto developed [..]

View Project

Save lives, impact economies.