Miyamoto International was called in to construct new, as-built structural drawings for the 23-ton, 35-foot diameter, custom, concave Sky Mirror after negotiations for purchase by Dallas Cowboys from Kapoor Studio were underway. Both destructive and non-destructive testing was performed to verify the structural integrity of the steel structure’s membrane and connections, which support it against the stresses of weather and wind. One particular challenge of this iconic project was to ensure the enormous steel structure’s unveiling would coincide with the Dallas Cowboys’ football schedule, which meant The Sky Mirror was slated to be installed at AT&T Stadium within four weeks. Despite having no existing structural drawings or fully dimensioned steel shop drawings available, Miyamoto rose to the challenge and The Sky Mirror was unveiled before the October 13, 2013 game.

Team Members

No data was found

Client

-

Year

2013

Scale

23 tons, 35-foot diameter

Location

Dallas, TX

Sky Mirror Sculpture

Miyamoto International was called in to construct new, as-built structural drawings for the 23-ton, 35-foot diameter, custom, concave Sky Mirror after negotiations for purchase by Dallas Cowboys from Kapoor Studio were underway. Both destructive and non-destructive testing was performed to verify the structural integrity of the steel structure’s membrane and connections, which support it against the stresses of weather and wind. One particular challenge of this iconic project was to ensure the enormous steel structure’s unveiling would coincide with the Dallas Cowboys’ football schedule, which meant The Sky Mirror was slated to be installed at AT&T Stadium within four weeks. Despite having no existing structural drawings or fully dimensioned steel shop drawings available, Miyamoto rose to the challenge and The Sky Mirror was unveiled before the October 13, 2013 game.

Client

-

Year

2013

Scale

23 tons, 35-foot diameter

Location

Dallas, TX

More Projects

Education

Estancia High School Aquatic Center

Costa Mesa, CA

The Estancia High School Aquatic Center received a complete make-over, much to the excitement and [..]

View Project

Art

Public Work by Peter Shire Wilshire Blvd/Home Depot

Los Angeles, CA

Peter Shire’s work called Public Work, demonstrates the convergence of 20th Century architecture and art [..]

View Project

Industrial, Tilt-Up

Tesla 3888 Calle Fortunada

San Diego, CA

The tenant improvement at 3888 Calle Fortunada involved modifying two existing concrete tilt-up warehouse buildings [..]

View Project

Healthcare, Tilt-Up

Hale Medical Office Building

Arcadia, CA

Hale Medical Center has an interesting story. Because the Methodist Hospital located in Arcadia, California [..]

View Project

Office, Tilt-Up

The Press Sunflower Addition

Costa Mesa, CA

Miyamoto Internati onal provided structural engineering services for the expansion of the Los Angeles Times’ [..]

View Project

Aviation

Miyamoto Earthquake Business Interruption Loss Control Program

Los Angeles

Miyamoto developed a tailored program to determine the existing risk to LAWA from earthquakes. Our [..]

View Project

Save lives, impact economies.

what we’re up to

Latest News & Updates

Subscribe to learn about new the latest in engineering news, solutions, and updates.

We care about your data in our privacy policy.