Sky Mirror Sculpture

Sky Mirror Sculpture

Miyamoto International was called in to construct new, as-built structural drawings for the 23-ton, 35-foot diameter, custom, concave Sky Mirror after negotiations for purchase by Dallas Cowboys from Kapoor Studio were underway. Both destructive and non-destructive testing was performed to verify the structural integrity of the steel structure’s membrane and connections, which support it against the stresses of weather and wind. One particular challenge of this iconic project was to ensure the enormous steel structure’s unveiling would coincide with the Dallas Cowboys’ football schedule, which meant The Sky Mirror was slated to be installed at AT&T Stadium within four weeks. Despite having no existing structural drawings or fully dimensioned steel shop drawings available, Miyamoto rose to the challenge and The Sky Mirror was unveiled before the October 13, 2013 game.

Team Members

No data was found

Client

-

Year

2013

Scale

23 tons, 35-foot diameter

Location

Dallas, TX

Sky Mirror Sculpture

Miyamoto International was called in to construct new, as-built structural drawings for the 23-ton, 35-foot diameter, custom, concave Sky Mirror after negotiations for purchase by Dallas Cowboys from Kapoor Studio were underway. Both destructive and non-destructive testing was performed to verify the structural integrity of the steel structure’s membrane and connections, which support it against the stresses of weather and wind. One particular challenge of this iconic project was to ensure the enormous steel structure’s unveiling would coincide with the Dallas Cowboys’ football schedule, which meant The Sky Mirror was slated to be installed at AT&T Stadium within four weeks. Despite having no existing structural drawings or fully dimensioned steel shop drawings available, Miyamoto rose to the challenge and The Sky Mirror was unveiled before the October 13, 2013 game.

Client

-

Year

2013

Scale

23 tons, 35-foot diameter

Location

Dallas, TX

More Projects

Mixed-use, Office, Parking

The Scattergood Unit 3 Repowering Project

Los Angeles, CA

The Scattergood Unit 3 Repowering Project was, and is, the first major step toward Los [..]

View Project

Education

Southwestern College, Wellness and Aquatic Center

Chula Vista, CA

As part of Southwestern College’s master planning effort for its facilities, this new wellness and [..]

View Project

Adaptive Reuse, Civic

Yuba County Sheriff Facility

Marysville, CA

This adaptive re-use project entailed re-purposing and improving an existing two-story, tilt-up commercial office building [..]

View Project

Retail, Sustainability

Hot Italian Restaurant

Sacramento, CA

Hot Italian, the ‘green’ pizza and panini restaurant and Italian clothing boutique, is part of [..]

View Project

Residential

The Villa Park Orchard (K-Residence Hall)

Orange, CA

The Villa Park Orchard (K-Residence Hall) is a unique student-housing project at Chapman University. It [..]

View Project

Commercial

St. Thomas More Sanctuary

Oceanside, CA

Miyamoto International, Inc. provided structural engineering services for the St. Thomas More Sanctuary. The parish [..]

View Project

Save lives, impact economies.

We use cookies

We use cookies to improve your experience on this website. You may choose which types of cookies to allow and change your preferences at any time. Disabling cookies may impact your experience on this website. You can learn more by viewing our Cookie Policy.