Southwestern College Institutional Technology Building

Southwestern College Institutional Technology Building

The Southwestern Community College Institutional Technology building is designed to support student life on campus, both functionally and visually. The IT building serves the students by providing critical campus services and the workspaces necessary to implement said services. The 16,000 square foot building includes data storage and networking spaces
in addition to office space and conference rooms throughout. A garden edge adorns the path along the quad. The quad edge serves the students as a visual backdrop for their daily lives, enhancing and enriching their experience within the quad. To create the desired aesthetic for the building, which uses heavy timber roof framing and acoustic metal deck with tilt-up wall construction—a rare combination of construction materials—the Miyamoto team had to do research and work with deck suppliers to develop a design they could demonstrate to the DSA for structural approval.

Team Members

No data was found

Client

Gensler

Year

2023

Scale

16,000 SF

Location

Chula Vista, CA

Southwestern College Institutional Technology Building

The Southwestern Community College Institutional Technology building is designed to support student life on campus, both functionally and visually. The IT building serves the students by providing critical campus services and the workspaces necessary to implement said services. The 16,000 square foot building includes data storage and networking spaces
in addition to office space and conference rooms throughout. A garden edge adorns the path along the quad. The quad edge serves the students as a visual backdrop for their daily lives, enhancing and enriching their experience within the quad. To create the desired aesthetic for the building, which uses heavy timber roof framing and acoustic metal deck with tilt-up wall construction—a rare combination of construction materials—the Miyamoto team had to do research and work with deck suppliers to develop a design they could demonstrate to the DSA for structural approval.

Client

Gensler

Year

2023

Scale

16,000 SF

Location

Chula Vista, CA

More Projects

Commercial, Mixed-use, Residential, Retail

The Lombardi

Los Angeles, CA

Construction is expected to begin soon on The Lombardi, a new, seven-story mixed-use building for [..]

View Project

Mixed-use, Residential

6041 Variel Avenue

Woodland Hills, CA

This project consists of two phases. The first phase is a 7-story mixed-use development, including [..]

View Project

Retail

The Briar Patch

Grass Valley, CA

The Briar Patch is a co-op and natural food store in Grass Valley’s Litton Retail [..]

View Project

Transportation

Port of Long Beach Pier B On-Dock Rail Support Facility

Long Beach, CA

To make way for a more sustainable future, the Port of Long Beach is modernizing [..]

View Project

Education

Mira Costa College Oceanside Campus Chemistry & Biotechnology Building

San Diego, CA

A new two-story, 23,300-SF chemistry and biotechnology laboratory building featuring eight total labs (biotech, bioprocessing, [..]

View Project

Residential

Hornet Commons

Sacramento, CA

This new student housing village at Sacramento State is an apartment-style community aimed at upper-division [..]

View Project

Save lives, impact economies.

what we’re up to

Latest News & Updates

Subscribe to learn about new the latest in engineering news, solutions, and updates.

We care about your data in our privacy policy.