Search
Close this search box.
Search
Close this search box.

Standard Works Parking Garage

Standard Works Parking Garage

The Standard Works parking structure is a new four-level, 398 space, Type I-A parking garage in El Segundo, CA, using a hybrid system of pre-cast gravity framing and cast-in-place concrete shear walls and foundations. With sloping grades on three sides of the structure of upwards of a 20’ difference, significant lateral soil loads had to be considered in the structural design. In addition, site constraints with existing buildings to the north and south forced nearly a quarter of the foundation to be dropped over 12’ below existing grade to avoid surcharging the other structures. Due to the shoring required adjacent to the existing structures as well as to the eastern property line, extensive grade beams and a number of eccentric footings at both gravity and shear wall elements were designed and detailed. A seismically tied ramp to the west serving only upper floors also induced loads on the lower level. Spans of over 60’ were accomplished by way of post-tensioned double-tee beams to pre-cast columns, with the interaction between both CIP and pre-cast elements requiring multiple rounds of coordination for effective solutions.

Team Members

No data was found

Client

Smoky Hollow Industries, LLC

Year

2018

Scale

Approximately 145,000 SF

Location

El Segundo, CA

Standard Works Parking Garage

The Standard Works parking structure is a new four-level, 398 space, Type I-A parking garage in El Segundo, CA, using a hybrid system of pre-cast gravity framing and cast-in-place concrete shear walls and foundations. With sloping grades on three sides of the structure of upwards of a 20’ difference, significant lateral soil loads had to be considered in the structural design. In addition, site constraints with existing buildings to the north and south forced nearly a quarter of the foundation to be dropped over 12’ below existing grade to avoid surcharging the other structures. Due to the shoring required adjacent to the existing structures as well as to the eastern property line, extensive grade beams and a number of eccentric footings at both gravity and shear wall elements were designed and detailed. A seismically tied ramp to the west serving only upper floors also induced loads on the lower level. Spans of over 60’ were accomplished by way of post-tensioned double-tee beams to pre-cast columns, with the interaction between both CIP and pre-cast elements requiring multiple rounds of coordination for effective solutions.

Client

Smoky Hollow Industries, LLC

Year

2018

Scale

Approximately 145,000 SF

Location

El Segundo, CA

More Projects

High-Rise

Exchange 106

Kuala Lumpur, Malaysia

The 106-story “Exchange 106” supertall high-rise in Malaysia will be the world’s 15th-tallest building. At [..]

View Project

Aviation

Regional Intermodal Transportation Center

Burbank, CA

Within the scope of the Regional Intermodal Transportation Center, Miyamoto International was responsible for designing [..]

View Project

Civic, Office, Retail, Tilt-Up

UnCommons

Las Vegas, NV

UnCommons is a mixed-use community, integrating office and living spaces with rich food, fitness, and [..]

View Project

Healthcare

Tri-City Medical Office Building

Carlsbad, CA

The Tri-City Medical Office Building is a three-story, 57,476-SF structure that utilizes a panelized wood [..]

View Project

Healthcare, Sustainability

Sutter Health North Bay Regional Surgery Center Novato

Novato, CA

Miyamoto International has remodeled this existing 3-story office building to become a medical office building [..]

View Project

Burlingame Park at 410 Airport Blvd Phase 1B

Burlingame, CA

A vacant nine-acre property at 410 Blvd is planned to be turned into a natural [..]

View Project

Save lives, impact economies.