Standard Works Parking Garage

Standard Works Parking Garage

The Standard Works parking structure is a new four-level, 398 space, Type I-A parking garage in El Segundo, CA, using a hybrid system of pre-cast gravity framing and cast-in-place concrete shear walls and foundations. With sloping grades on three sides of the structure of upwards of a 20’ difference, significant lateral soil loads had to be considered in the structural design. In addition, site constraints with existing buildings to the north and south forced nearly a quarter of the foundation to be dropped over 12’ below existing grade to avoid surcharging the other structures. Due to the shoring required adjacent to the existing structures as well as to the eastern property line, extensive grade beams and a number of eccentric footings at both gravity and shear wall elements were designed and detailed. A seismically tied ramp to the west serving only upper floors also induced loads on the lower level. Spans of over 60’ were accomplished by way of post-tensioned double-tee beams to pre-cast columns, with the interaction between both CIP and pre-cast elements requiring multiple rounds of coordination for effective solutions.

Team Members

No data was found

Client

Smoky Hollow Industries, LLC

Year

2018

Scale

Approximately 145,000 SF

Location

El Segundo, CA

Standard Works Parking Garage

The Standard Works parking structure is a new four-level, 398 space, Type I-A parking garage in El Segundo, CA, using a hybrid system of pre-cast gravity framing and cast-in-place concrete shear walls and foundations. With sloping grades on three sides of the structure of upwards of a 20’ difference, significant lateral soil loads had to be considered in the structural design. In addition, site constraints with existing buildings to the north and south forced nearly a quarter of the foundation to be dropped over 12’ below existing grade to avoid surcharging the other structures. Due to the shoring required adjacent to the existing structures as well as to the eastern property line, extensive grade beams and a number of eccentric footings at both gravity and shear wall elements were designed and detailed. A seismically tied ramp to the west serving only upper floors also induced loads on the lower level. Spans of over 60’ were accomplished by way of post-tensioned double-tee beams to pre-cast columns, with the interaction between both CIP and pre-cast elements requiring multiple rounds of coordination for effective solutions.

Client

Smoky Hollow Industries, LLC

Year

2018

Scale

Approximately 145,000 SF

Location

El Segundo, CA

More Projects

Civic, Education

Lafayette Park Recreation Center

Los Angeles, CA

The Lafayette Park Recreation Center is the first completed LEED-certified building for the client, the [..]

View Project

Residential

Welbrook Southbay Assisted Living and Memory Care

Torrance, CA

Miyamoto International provided structural engineering services for the Welbrook Southbay Assisted Living and Memory Care [..]

View Project

Commercial

Santa Clara Towers Renovation

Santa Clara, CA

Miyamoto provided structural engineering services for an extensive entrance and lobby renovation at this prominent [..]

View Project

Tilt-Up

California State University, Los Angeles Corporation Yard and Public Safety Building

Los Angeles, CA

This design-build project for the California State University Los Angeles campus consisted of three buildings [..]

View Project

Civic

The Ziggurat California Department of General Services Headquarters

West Sacramento, CA

This 11-story, pyramid-shaped mission-critical building is the Headquarters of the Department of General Services and [..]

View Project

Commercial

1816 Vermont Avenue Appendix A

Los Angeles, CA

Miyamoto International is providing structural engineering services related to the evaluation of the Unreinforced Masonry [..]

View Project

Save lives, impact economies.

We use cookies

We use cookies to improve your experience on this website. You may choose which types of cookies to allow and change your preferences at any time. Disabling cookies may impact your experience on this website. You can learn more by viewing our Cookie Policy.