Miyamoto International has remodeled this existing 3-story office building to become a medical office building for Sutter Health. The existing building consists of a concrete tilt-up wall with structural steel beams, columns and wood joists. Each floor consists of approximately 18,000 SF. The surgery center is located at the first floor occupying approximately 10,000 SF. Our team provided expert structural engineering solutions to not only make this building functional for its new use but also collaborated in the design to incorporate sustainable energy-saving elements. This Surgery Center became one of the first buildings in California to receive LEED Gold Certification for Healthcare Centers.
2009
Boulder Architects
36,000 SF
Novato, CA
Miyamoto International has remodeled this existing 3-story office building to become a medical office building for Sutter Health. The existing building consists of a concrete tilt-up wall with structural steel beams, columns and wood joists. Each floor consists of approximately 18,000 SF. The surgery center is located at the first floor occupying approximately 10,000 SF. Our team provided expert structural engineering solutions to not only make this building functional for its new use but also collaborated in the design to incorporate sustainable energy-saving elements. This Surgery Center became one of the first buildings in California to receive LEED Gold Certification for Healthcare Centers.
2009
Boulder Architects
36,000 SF
Novato, CA
© 2025 Miyamoto International. All Rights Reserved.