Sacramento

Sutter Health Radiation Oncology Center

Sutter Health Radiation Oncology Center

The NPC-4 Evaluation of the Sutter Health Radiation Oncology Center consisted of reviewing as-built documentation and validating the existing NPC-4 components found within the Radiation Oncology Center (ROC). A matrix was developed and the previously-approved OSHPD components within the ROC were identified and included within the matrix. The Oncology department was operational during the validation and the remediation phase. The team met with user groups to create work flow that minimized disruption by working after hours and by mobilizing room-by-room rather than a conventional approach of mobilizing each discipline throughout the entire space at once. The team provided equipment supports, anchorage, non-structural wall support, upgraded seismic bracing and anchorage of the existing NPC components and prepared an OSHPD compliance plan for the Women’s and Children’s Center and ROC.

Team Members

No data was found

Client

Sutter Health

Year

2017

Scale

-

Location

Sacramento, CA

Sutter Health Radiation Oncology Center

The NPC-4 Evaluation of the Sutter Health Radiation Oncology Center consisted of reviewing as-built documentation and validating the existing NPC-4 components found within the Radiation Oncology Center (ROC). A matrix was developed and the previously-approved OSHPD components within the ROC were identified and included within the matrix. The Oncology department was operational during the validation and the remediation phase. The team met with user groups to create work flow that minimized disruption by working after hours and by mobilizing room-by-room rather than a conventional approach of mobilizing each discipline throughout the entire space at once. The team provided equipment supports, anchorage, non-structural wall support, upgraded seismic bracing and anchorage of the existing NPC components and prepared an OSHPD compliance plan for the Women’s and Children’s Center and ROC.

Client

Sutter Health

Year

2017

Scale

-

Location

Sacramento, CA

More Projects

Lab and Science

University of California, Irvine, Medical Center Replacement Hospital, Phases 1 and 2

Torrance, CA

Miyamoto provided structural peer review services for the bridging and construction documents of this design-build [..]

View Project

Office

Riverside County Office of Education Conference Center

Riverside, CA

The Riverside County Office of Education (RCOE) Conference Center is designed to meet the growing [..]

View Project

Transportation

Port of Long Beach Pier B On-Dock Rail Support Facility

Long Beach, CA

To make way for a more sustainable future, the Port of Long Beach is modernizing [..]

View Project

Lab and Science

Valley Children’s Medical Center

Bakersfield, CA

Miyamoto International provided design-build services for the Medical Office Building at the Valley Children’s Medical [..]

View Project

Commercial, Office

Milpitas Campus Center

Milpitas, CA

Miyamoto International provided structural engineering services for the renovation of the Milpitas Campus Center. This [..]

View Project

Aviation

Regional Intermodal Transportation Center

Burbank, CA

Within the scope of the Regional Intermodal Transportation Center, Miyamoto International was responsible for designing [..]

View Project

Save lives, impact economies.

We use cookies

We use cookies to improve your experience on this website. You may choose which types of cookies to allow and change your preferences at any time. Disabling cookies may impact your experience on this website. You can learn more by viewing our Cookie Policy.