San Francisco

Sutter Van Ness Medical Office Building

Sutter Van Ness Medical Office Building

Serving the Cathedral Hill neighborhood in downtown San Francisco, this 496,104-SF medical office building for Sutter Health includes 10 stories above grade and six levels of parking below grade. The structural system utilizes buckling-restrained braced frames strategically located to accommodate the building’s “wedding cake” profile. The upper levels incorporate “green roofs” into the design and provide large accessible outdoor areas for tenants and patients to relax and enjoy. The project also includes an underground tunnel connecting the facility to adjacent facilities across Van Ness Avenue. Miyamoto is the Structural Engineer of Record.

Team Members

Client

Pankow Builders

Year

2018

Scale

496,104 SF
9 levels of medical offices
6+ levels subterranean parking; 383 spaces

Location

San Francisco

Sutter Van Ness Medical Office Building

Serving the Cathedral Hill neighborhood in downtown San Francisco, this 496,104-SF medical office building for Sutter Health includes 10 stories above grade and six levels of parking below grade. The structural system utilizes buckling-restrained braced frames strategically located to accommodate the building’s “wedding cake” profile. The upper levels incorporate “green roofs” into the design and provide large accessible outdoor areas for tenants and patients to relax and enjoy. The project also includes an underground tunnel connecting the facility to adjacent facilities across Van Ness Avenue. Miyamoto is the Structural Engineer of Record.

Client

Pankow Builders

Year

2018

Scale

496,104 SF
9 levels of medical offices
6+ levels subterranean parking; 383 spaces

Location

San Francisco

More Projects

Civic, Retrofit

Yuba City Fire Station #4 Retrofit

Yuba City, CA

Miyamoto was commissioned to perform an evaluation of the Structural Code Deficiencies of Yuba City [..]

View Project

Industrial

JFC Distribution Center

Commerce, CA

Miyamoto provided structural engineering for the conversion of this existing 190,000-SF warehouse in Commerce to [..]

View Project

Adaptive Reuse, Retrofit

Antler Hotel, Historic and Seismic Rehabilitation

Lemoore, CA

This two-story, unreinforced masonry (URM) building with a partial basement is located in the heart [..]

View Project

Education

Estancia High School Aquatic Center

Costa Mesa, CA

The Estancia High School Aquatic Center received a complete make-over, much to the excitement and [..]

View Project

Industrial, Tilt-Up

Tesla 3888 Calle Fortunada

San Diego, CA

The tenant improvement at 3888 Calle Fortunada involved modifying two existing concrete tilt-up warehouse buildings [..]

View Project

Industrial

Good Eggs Tenant Improvement

Oakland, CA

Miyamoto provided tenant improvement services to an existing tilt-up building owned by a grocery delivery [..]

View Project

Save lives, impact economies.

what we’re up to

Latest News & Updates

Subscribe to learn about new the latest in engineering news, solutions, and updates.

We care about your data in our privacy policy.