San Diego

Sycamore Academy

Sycamore Academy

Sycamore Academy is a new K-8 charter school campus with six buildings featuring 22 classrooms, a multipurpose building with lab/ art studio/assembly area and an administration building. Miyamoto worked with a wood truss manufacturer early in the design process to create the building’s visually appealing and unique profile, with a design that was also cost effective. The premanufactured wood trusses are painted and exposed in the classrooms. The trusses also cantilever over the exterior building wall to create a walkway canopy. From design through construction, Miyamoto was instrumental and attentive to meet the aggressive, six-month construction schedule. Classrooms are separated by barn doors that open to allow collaboration. The buildings feature two-story-high glass windows on one side of each building. Unique seismic transfer detailing was required at the two-story-high windows and transfer across the cantilevered walkway canopy portion of the roof trusses.

Team Members

No data was found

Client

PJHM Architects

Year

2016

Scale

36,000 SF

Location

Wildomar, CA

Sycamore Academy

Sycamore Academy is a new K-8 charter school campus with six buildings featuring 22 classrooms, a multipurpose building with lab/ art studio/assembly area and an administration building. Miyamoto worked with a wood truss manufacturer early in the design process to create the building’s visually appealing and unique profile, with a design that was also cost effective. The premanufactured wood trusses are painted and exposed in the classrooms. The trusses also cantilever over the exterior building wall to create a walkway canopy. From design through construction, Miyamoto was instrumental and attentive to meet the aggressive, six-month construction schedule. Classrooms are separated by barn doors that open to allow collaboration. The buildings feature two-story-high glass windows on one side of each building. Unique seismic transfer detailing was required at the two-story-high windows and transfer across the cantilevered walkway canopy portion of the roof trusses.

Client

PJHM Architects

Year

2016

Scale

36,000 SF

Location

Wildomar, CA

More Projects

Lab and Science

University of California, Irvine, Medical Center Replacement Hospital, Phases 1 and 2

Torrance, CA

Miyamoto provided structural peer review services for the bridging and construction documents of this design-build [..]

View Project

Healthcare, Office

Brea Medical Office Building

Brea, CA

Miyamoto International provided structural engineering design services for this four-story, dual lateral system medical office [..]

View Project

Industrial

JFC Distribution Center

Commerce, CA

Miyamoto provided structural engineering for the conversion of this existing 190,000-SF warehouse in Commerce to [..]

View Project

Lab and Science

King-Chavez Health Center

San Diego, CA

This 25,000-SF clinic provides preventive care and comprehensive medical services for vulnerable and low-income residents. [..]

View Project

Industrial, Lab and Science

Gemini TI

West Sacramento, CA

Gemini TI is a tenant improvement project, which converted 25,000-SF of warehouse space into a [..]

View Project

Veteran-C3D-snapshot_11zon

Residential

Veteran Commons Affordable & Supportive Housing 

Downey, California

Veteran Commons at 11269 Garfield Avenue in Downey, California, provides 100 affordable homes, including supportive [..]

View Project

Save lives, impact economies.

what we’re up to

Latest News & Updates

Subscribe to learn about new the latest in engineering news, solutions, and updates.

We care about your data in our privacy policy.