The Scattergood Unit 3 Repowering Project

The Scattergood Unit 3 Repowering Project

The Scattergood Unit 3 Repowering Project was, and is, the first major step toward Los Angeles’s clean energy future. The project centered around improving fuel efficiency, reducing emissions and protecting the local marine habitats through modern, new technology that does not require the use of ocean water cooling. Miyamoto provided structural engineering services for the 19,000-SF Control Building, a four-story structure containing the Unit 3 DCS room, offices and storage facilities. The building was designed as a Risk Category IV, featuring composite floors that are supported by structural steel framing as well as seismic load resistance that is provided by buckling-restrained braced frames. Because it is located on a steep hillside, our engineers incorporated a 22-foot-tall concrete retaining wall in the building’s design. We also served as the Structural Engineer of Record for an associated 6,600-SF pre-engineered warehouse.

Team Members

No data was found

Client

Ware Malcomb

Year

2015

Scale

19,000 SF Control Tower 6,600 SF Warehouse

Location

Los Angeles, CA

The Scattergood Unit 3 Repowering Project

The Scattergood Unit 3 Repowering Project was, and is, the first major step toward Los Angeles’s clean energy future. The project centered around improving fuel efficiency, reducing emissions and protecting the local marine habitats through modern, new technology that does not require the use of ocean water cooling. Miyamoto provided structural engineering services for the 19,000-SF Control Building, a four-story structure containing the Unit 3 DCS room, offices and storage facilities. The building was designed as a Risk Category IV, featuring composite floors that are supported by structural steel framing as well as seismic load resistance that is provided by buckling-restrained braced frames. Because it is located on a steep hillside, our engineers incorporated a 22-foot-tall concrete retaining wall in the building’s design. We also served as the Structural Engineer of Record for an associated 6,600-SF pre-engineered warehouse.

Client

Ware Malcomb

Year

2015

Scale

19,000 SF Control Tower 6,600 SF Warehouse

Location

Los Angeles, CA

More Projects

Civic, Retail

Loftworks at 2600 Capitol

Vacaville, CA

2600 Capitol Office Building, also known as the Green Office Building, is a clean, modern [..]

View Project

Transportation

The Mobility Hub at LTCC

South Lake Tahoe, CA

The Mobility Hub at LTCC is part of a broader plan to bring clean transportation [..]

View Project

Residential, Retrofit

University of California, Riverside Lothian Residence Hall, Seismic Upgrades

Riverside, CA

Miyamoto provided structural engineering design services for the University of California, Riverside Lothian Residence Hall. [..]

View Project

Historic and Seismic Rehabilitation, Hospitality, Residential, Retrofit

The Exchange Sacramento (California Fruit Building Renovation)

Sacramento, CA

Originally built in 1914, the California Fruit Building was the tallest building west of the [..]

View Project

Hospitality, Sustainability

Miyako Hybrid Hotel

Torrence, CA

The Miyako Hybrid Hotel is an eight-story, 209-room, eco-friendly boutique hotel and spa in Torrance [..]

View Project

Industrial, Marine, Turkey

Yonca Onuk Shipyard

Yonca Onuk Shipyard in Turkey required a detailed assessment and feasibility study for the rehabilitation [..]

View Project

Save lives, impact economies.