The Scattergood Unit 3 Repowering Project

The Scattergood Unit 3 Repowering Project

The Scattergood Unit 3 Repowering Project was, and is, the first major step toward Los Angeles’s clean energy future. The project centered around improving fuel efficiency, reducing emissions and protecting the local marine habitats through modern, new technology that does not require the use of ocean water cooling. Miyamoto provided structural engineering services for the 19,000-SF Control Building, a four-story structure containing the Unit 3 DCS room, offices and storage facilities. The building was designed as a Risk Category IV, featuring composite floors that are supported by structural steel framing as well as seismic load resistance that is provided by buckling-restrained braced frames. Because it is located on a steep hillside, our engineers incorporated a 22-foot-tall concrete retaining wall in the building’s design. We also served as the Structural Engineer of Record for an associated 6,600-SF pre-engineered warehouse.

Team Members

No data was found

Client

Ware Malcomb

Year

2015

Scale

19,000 SF Control Tower 6,600 SF Warehouse

Location

Los Angeles, CA

The Scattergood Unit 3 Repowering Project

The Scattergood Unit 3 Repowering Project was, and is, the first major step toward Los Angeles’s clean energy future. The project centered around improving fuel efficiency, reducing emissions and protecting the local marine habitats through modern, new technology that does not require the use of ocean water cooling. Miyamoto provided structural engineering services for the 19,000-SF Control Building, a four-story structure containing the Unit 3 DCS room, offices and storage facilities. The building was designed as a Risk Category IV, featuring composite floors that are supported by structural steel framing as well as seismic load resistance that is provided by buckling-restrained braced frames. Because it is located on a steep hillside, our engineers incorporated a 22-foot-tall concrete retaining wall in the building’s design. We also served as the Structural Engineer of Record for an associated 6,600-SF pre-engineered warehouse.

Client

Ware Malcomb

Year

2015

Scale

19,000 SF Control Tower 6,600 SF Warehouse

Location

Los Angeles, CA

More Projects

Commercial

The Shops at Sportsmen’s Lodge

Studio City, CA

The Shops at Sportsmen’s Lodge is the premier destination in the Valley for shopping, dining, [..]

View Project

Education

San Leandro High School Gymnasium

San Leandro, CA

In 2024, the San Leandro Unified School District welcomed this new, $67-million gymnasium in San [..]

View Project

Transportation

Foothill Transit Irwindale Maintenance & Operations Facilities

Irwindale, CA

For this new bus maintenance and operations facility, Miyamoto used a variety of materials and [..]

View Project

Industrial

Matahari Terbit Jewelry Factory & Campus Expansion

Bandung, Indonesia

When Matahari Terbit expanded its jewelry manufacturing operations onto adjacent land, it called on Miyamoto [..]

View Project

Lab and Science

UCI Biological Sciences Building Unit 3

Irvine, CA

As part of a design-build competition, the Biological Sciences Building Unit 3 is a new [..]

View Project

Lab and Science

Briggsmore Specialty Center

Modesto, CA

Briggsmore Specialty Center houses specialists in cardiology, general surgery, gastroenterology, obstetrics and gynecology, and orthopedics. [..]

View Project

Save lives, impact economies.

what we’re up to

Latest News & Updates

Subscribe to learn about new the latest in engineering news, solutions, and updates.

We care about your data in our privacy policy.