The Scattergood Unit 3 Repowering Project was, and is, the first major step toward Los Angeles’s clean energy future. The project centered around improving fuel efficiency, reducing emissions and protecting the local marine habitats through modern, new technology that does not require the use of ocean water cooling. Miyamoto provided structural engineering services for the 19,000-SF Control Building, a four-story structure containing the Unit 3 DCS room, offices and storage facilities. The building was designed as a Risk Category IV, featuring composite floors that are supported by structural steel framing as well as seismic load resistance that is provided by buckling-restrained braced frames. Because it is located on a steep hillside, our engineers incorporated a 22-foot-tall concrete retaining wall in the building’s design. We also served as the Structural Engineer of Record for an associated 6,600-SF pre-engineered warehouse.

Client

Ware Malcomb

Year

2015

Scale

19,000 SF Control Tower 6,600 SF Warehouse

Location

Los Angeles, CA

The Scattergood Unit 3 Repowering Project

The Scattergood Unit 3 Repowering Project was, and is, the first major step toward Los Angeles’s clean energy future. The project centered around improving fuel efficiency, reducing emissions and protecting the local marine habitats through modern, new technology that does not require the use of ocean water cooling. Miyamoto provided structural engineering services for the 19,000-SF Control Building, a four-story structure containing the Unit 3 DCS room, offices and storage facilities. The building was designed as a Risk Category IV, featuring composite floors that are supported by structural steel framing as well as seismic load resistance that is provided by buckling-restrained braced frames. Because it is located on a steep hillside, our engineers incorporated a 22-foot-tall concrete retaining wall in the building’s design. We also served as the Structural Engineer of Record for an associated 6,600-SF pre-engineered warehouse.

Client

Ware Malcomb

Year

2015

Scale

19,000 SF Control Tower 6,600 SF Warehouse

Location

Los Angeles, CA

More Projects

OfficeRetail

Pearson’s Building

Woodland, CA

This two-story, unreinforced brick masonry building was built in 1875 on downtown Woodland’s historic Main [..]

View Project

Adaptive ReuseCommercialResidentialRetailRetrofitSeismic Retrofit/Heritage Renovation

The Elliott Building

Sacramento, CA

The Elliott Building is an 80-year-old, historic concrete structure that formerly housed a car dealership [..]

View Project

High-Rise

Bovis Istanbul Headquarter

Istanbul, Turkey

Miyamoto Turkey provided an earthquake assessment and structural due-diligence study for the Bovis Istanbul Headquarters [..]

View Project

Civic

The Roebbelen Center At the Grounds Event Center

Roseville, CA

Formerly called the Placer County Fairgrounds, The Roebbelen Center @ the Grounds is the largest [..]

View Project

Adaptive ReuseRetrofit

Hyatt Place & Hyatt House Adaptive Reuse and Seismic Retrofit

Los Angeles, CA

The dual-branded Hyatt House & Hyatt Place LAX was originally built and designed for office [..]

View Project

IndustrialTilt-Up

Tesla 3888 Calle Fortunada

San Diego, CA

The tenant improvement at 3888 Calle Fortunada involved modifying two existing concrete tilt-up warehouse buildings [..]