Search
Close this search box.
Search
Close this search box.

The Stockton

The Stockton, originally a 252-room hotel built in 1910 and listed on the National Register of Historic Places, lay vacant for 20 years due to cost-prohibitive and function-prohibitive rehabilitation designs by other engineers. Miyamoto’s High-Performance Earthquake Engineering approach made this adaptive re-use project viable, preserving the integrity of the historic structure, while providing new office and retail spaces along with affordable senior housing units.

The seismic technology employed by Miyamoto provided  more than a 20% reduction in story drift, protecting existing brittle materials and reducing member stresses to nearly elastic levels. Building performance was upgraded from potential collapse to near immediate occupancy after a major seismic event. Miyamoto performed nonlinear dynamic analyses and designed seismic shock dampers and fiber reinforced polymer composites at the first story level to reduce seismic demand, producing a very economical rehabilitation cost of $9/SF. The innovative rehabilitation of this city’s iconic hotel won many awards.

Awards

2007 California Preservation Foundation Design Award for Rehabilitation
2005 Certificate of Recognition of Preserving and Restoring the Historic Landmark, California State Assembly
2005 Excellence in Structural Engineering Awards, Special Use Structures, SEAOC (Structural Engineers Association of Central California)
2005 Best Historic Rehabilitation, Affordable Housing, National Housing & Rehabilitation Association
2005 Honorable Mention, Affordable Housing Tax Credit Coalition

Team Members

No data was found

Client

-

Year

-

Scale

145,000 SF

Location

Stockton, CA

The Stockton

The Stockton, originally a 252-room hotel built in 1910 and listed on the National Register of Historic Places, lay vacant for 20 years due to cost-prohibitive and function-prohibitive rehabilitation designs by other engineers. Miyamoto’s High-Performance Earthquake Engineering approach made this adaptive re-use project viable, preserving the integrity of the historic structure, while providing new office and retail spaces along with affordable senior housing units.

The seismic technology employed by Miyamoto provided  more than a 20% reduction in story drift, protecting existing brittle materials and reducing member stresses to nearly elastic levels. Building performance was upgraded from potential collapse to near immediate occupancy after a major seismic event. Miyamoto performed nonlinear dynamic analyses and designed seismic shock dampers and fiber reinforced polymer composites at the first story level to reduce seismic demand, producing a very economical rehabilitation cost of $9/SF. The innovative rehabilitation of this city’s iconic hotel won many awards.

Awards

2007 California Preservation Foundation Design Award for Rehabilitation
2005 Certificate of Recognition of Preserving and Restoring the Historic Landmark, California State Assembly
2005 Excellence in Structural Engineering Awards, Special Use Structures, SEAOC (Structural Engineers Association of Central California)
2005 Best Historic Rehabilitation, Affordable Housing, National Housing & Rehabilitation Association
2005 Honorable Mention, Affordable Housing Tax Credit Coalition

Client

-

Year

-

Scale

145,000 SF

Location

Stockton, CA

More Projects

Industrial, Tilt-Up

Keystone West Business Park

Patterson, CA

Keystone West Business Park is an 820,000-SF, LEED-Gold distribution center for W.W. Grainger, Inc. The [..]

View Project

Entertainment

Channel 24 

Sacramento, CA

Located on the southwestern corner of 24th and R streets, Channel 24 is a new [..]

View Project

High-Rise

Exchange 106

Kuala Lumpur, Malaysia

The 106-story “Exchange 106” supertall high-rise in Malaysia will be the world’s 15th-tallest building. At [..]

View Project

Industrial, Tilt-Up, Warehouse & Distribution

Prologis Cheyenne Distribution Center

Clark County, NV

Prologis Cheyenne #3 is a 163,000-SF single-story concrete distribution center in Clark County, Nevada built [..]

View Project

Retrofit

Caribbean School, Science Labs Structural Repairs

Ponce, PR

During the 2020 Puerto Rico earthquake, a magnitude 6.4 that was preceded by a swarm [..]

View Project

Healthcare, Parking

Sharp Chula Vista Parking Structure

Chula Vista, California

Sharp Chula Vista is calling this project “the parking structure of the future.” The seven-level, [..]

View Project

Save lives, impact economies.