Miyamoto International served as the structural Quality Control (QC) inspector for this U.S. Armed Forces Reserve Center. As required by the US Army Corps of Engineers, the team inspected the wind and seismic main lateral force resisting system, components and cladding. The structural components used on this project, such as the steel moment frame structure (for high seismic and wind loads) and insulated concrete forms (ICF) walls (which were new to the local market), challenged the local contractors due to their lack of experience working with these non-standard (to local market) materials. Our detailed structural quality control and technical support to local contractors provided an important bridge between US designers and local contractors to assure that the construction met the specified structural requirements while decreasing any possible delay.

Team Members

No data was found

Client

U.S. Army Corps of Engineers

Year

2013

Scale

81,600 SF

Location

Guaynabo, PR

U.S. Armed Forces Reserve Center

Miyamoto International served as the structural Quality Control (QC) inspector for this U.S. Armed Forces Reserve Center. As required by the US Army Corps of Engineers, the team inspected the wind and seismic main lateral force resisting system, components and cladding. The structural components used on this project, such as the steel moment frame structure (for high seismic and wind loads) and insulated concrete forms (ICF) walls (which were new to the local market), challenged the local contractors due to their lack of experience working with these non-standard (to local market) materials. Our detailed structural quality control and technical support to local contractors provided an important bridge between US designers and local contractors to assure that the construction met the specified structural requirements while decreasing any possible delay.

Client

U.S. Army Corps of Engineers

Year

2013

Scale

81,600 SF

Location

Guaynabo, PR

More Projects

Lab and Science, Sustainability, Tilt-Up

University of California San Diego, East Campus Medical Office Building

San Diego, CA

At approximately 75,000 SF, this University of California, San Diego Office building is a three-story, [..]

View Project

Commercial, Parking

Qualcomm Pacific Center Parking Structure

San Diego, California

At Qualcomm Pacific Center, the parking structure presented several challenges. To accommodate the new AY [..]

View Project

Residential

The Olive Plaza Building

Eugene, OR

The Olive Plaza Building was originally constructed in the 1980s. Miyamoto provided a seismic rehabilitation [..]

View Project

Industrial, Tilt-Up

Otay Logistics Center

Otay Mesa, CA

Otay Logistics Center is a 15-acre site in San Diego consisting of two industrial buildings. [..]

View Project

Civic

Domestic Violence Shelter and Resource Center 

Reno, NV

With the mission to address the increasing demand for domestic violence services in the region, [..]

View Project

Civic, Retrofit

Hollywood Bowl

Los Angeles, CA

The iconic Hollywood Bowl in Los Angeles is known for its band shell, a distinctive set [..]

View Project

Save lives, impact economies.

what we’re up to

Latest News & Updates

Subscribe to learn about new the latest in engineering news, solutions, and updates.

We care about your data in our privacy policy.