U.S. Post Office & Federal Building Seismic Rehabilitation

U.S. Post Office & Federal Building Seismic Rehabilitation

When the Federal Building required rehabilitation to improve its seismic resistance and sustainability over time, one of the challenges was that it also housed Sacramento’s Main Downtown Sacramento Post Office, which had to remain in continuous service to the public during the project. The four-story plus basement office building was constructed with steel frame; unreinforced masonry; and terracotta, non-bearing exterior walls. Because the structure lacked a seismic resistive system, Miyamoto designed reinforced concrete shear walls to resist lateral load in both directions and tied the unreinforced masonry and terracotta walls to the main building frame. The retrofit was accomplished in unobtrusive phases. The building presently houses staff offices for the State of California, U.S. Post Office and Federal Building.

Team Members

No data was found

Client

-

Year

1996

Scale

100,000 SF

Location

Sacramento, CA

U.S. Post Office & Federal Building Seismic Rehabilitation

When the Federal Building required rehabilitation to improve its seismic resistance and sustainability over time, one of the challenges was that it also housed Sacramento’s Main Downtown Sacramento Post Office, which had to remain in continuous service to the public during the project. The four-story plus basement office building was constructed with steel frame; unreinforced masonry; and terracotta, non-bearing exterior walls. Because the structure lacked a seismic resistive system, Miyamoto designed reinforced concrete shear walls to resist lateral load in both directions and tied the unreinforced masonry and terracotta walls to the main building frame. The retrofit was accomplished in unobtrusive phases. The building presently houses staff offices for the State of California, U.S. Post Office and Federal Building.

Client

-

Year

1996

Scale

100,000 SF

Location

Sacramento, CA

More Projects

Industrial, Marine, Turkey

Yonca Onuk Shipyard

Yonca Onuk Shipyard in Turkey required a detailed assessment and feasibility study for the rehabilitation [..]

View Project

Retail

Made in Napa Valley

Napa, CA

Made in Napa Valley selected Miyamoto International as the structural engineer for their expansion project, [..]

View Project

Transportation

Metro Exposition Light Rail Line, Phases I & II

Downtown LA

Miyamoto provided structural design and construction administration for all 17 stations on both phases of [..]

View Project

Commercial, Hospitality

Washington Family Ranch Expansion

The Washington Family Ranch in Central Oregon is one of 25 Young Life camps in the [..]

View Project

Healthcare, Office

Brea Medical Office Building

Brea, CA

Miyamoto International provided structural engineering design services for this four-story, dual lateral system medical office [..]

View Project

Retrofit

The Holy Rosary Community Center

Woodland, CA

The Holy Rosary Community Center is a 20,000-SF, single-story addition to the existing church, providing [..]

View Project

Save lives, impact economies.

what we’re up to

Latest News & Updates

Subscribe to learn about new the latest in engineering news, solutions, and updates.

We care about your data in our privacy policy.