University of California, Irvine, Medical Center Replacement Hospital, Phases 1 and 2

University of California, Irvine, Medical Center Replacement Hospital, Phases 1 and 2

Miyamoto provided structural peer review services for the bridging and construction documents of this design-build project. The seven-story (plus basement), 191-bed hospital is a concentrically braced, steel-frame building that provides acute care services. The project also included a one-story, steel-braced frame central plant structure. This hospital was one of the first in California to be built via a design-build delivery method. This project utilized BIM to accelerate the construction schedule and improve quality. The clinical lab replacement building included in this project is LEED certified. Miyamoto International

Team Members

No data was found

Client

UC Irvine Design and Constructi on Services

Year

2015

Scale

482,000 SF

Location

Torrance, CA

University of California, Irvine, Medical Center Replacement Hospital, Phases 1 and 2

Miyamoto provided structural peer review services for the bridging and construction documents of this design-build project. The seven-story (plus basement), 191-bed hospital is a concentrically braced, steel-frame building that provides acute care services. The project also included a one-story, steel-braced frame central plant structure. This hospital was one of the first in California to be built via a design-build delivery method. This project utilized BIM to accelerate the construction schedule and improve quality. The clinical lab replacement building included in this project is LEED certified. Miyamoto International

Client

UC Irvine Design and Constructi on Services

Year

2015

Scale

482,000 SF

Location

Torrance, CA

More Projects

Hospitality

Blue Water Glen Ivy Sports Club

Corona, CA

The Blue Water Sports Club in Glen Ivy, California is a one-story, steel-framed structure with [..]

View Project

Civic

Sacramento Employment and Training Agency (SETA)

Sacramento, CA

The SETA building is a 94,380-SF single story concrete tilt-up. This existing Blue Diamond Almond [..]

View Project

MEP

Chevron, Building H-LL Global Security Information Center Renovation

San Ramon, CA

The team provided electrical engineering services to convert an existing storage basement into a 24-hour [..]

View Project

Office, Retrofit

One Capitol Mall

Sacramento, CA

The beautiful One Capitol Mall, bedecked with marble and bronze, was originally built in 1993. [..]

View Project

Education

Southwestern College Instructional Complex 1

Chula Vista, CA

The Southwestern College’s Instructional Complex 1 addresses the demand for highly effective general-use instructional space [..]

View Project

Civic, Seismic Retrofit/Heritage Renovation

Griffith Observatory

Los Angeles, CA

An architectural icon of Los Angeles, the renovation of Griffith Observatory was a major feat [..]

View Project

Save lives, impact economies.

We use cookies

We use cookies to improve your experience on this website. You may choose which types of cookies to allow and change your preferences at any time. Disabling cookies may impact your experience on this website. You can learn more by viewing our Cookie Policy.