Search
Close this search box.

University of California San Diego, East Campus Medical Office Building

University of California San Diego, East Campus Medical Office Building

At approximately 75,000 SF, this University of California, San Diego Office building is a three-story, campus medical office building with tilt-up construction. The design-build team approach for this building is to shape design around the prioritization and balance of: work, environment, and economics. We are designing for the University’s investment in a medical office building that will support multiple tenant occupancy, and to anticipate the long-term objectives for the University around their campus building inventory requirements. The project objectives include achieving LEED Silver certification.

Client

CW Driver and Gensler

Year

2011

Scale

75,000 SF

Location

San Diego, CA

University of California San Diego, East Campus Medical Office Building

At approximately 75,000 SF, this University of California, San Diego Office building is a three-story, campus medical office building with tilt-up construction. The design-build team approach for this building is to shape design around the prioritization and balance of: work, environment, and economics. We are designing for the University’s investment in a medical office building that will support multiple tenant occupancy, and to anticipate the long-term objectives for the University around their campus building inventory requirements. The project objectives include achieving LEED Silver certification.

Client

CW Driver and Gensler

Year

2011

Scale

75,000 SF

Location

San Diego, CA

More Projects

Transportation

Exposition Light Rail Line Phase I

Los Angeles, CA

Miyamoto participated in the structural design of six at-grade and three elevated stations for new [..]

View Project

Civic

Los Angeles Police Academy Training Facility

City of Los Angeles, RNL Design

The Los Angeles Police Academy Training Center consists of four one-and two-story reinforced concrete shear [..]

View Project

Civic

County of San Diego North Coastal Health and Human Services Administration

Oceanside, CA

This 46,229-SF facility for the County of San Diego’s Health and Human Services agency includes [..]

View Project

HealthcareLab and Science

Sutter Gould Medical Foundation Modesto

Modesto, CA

Sutter Gould Medical Foundation is a four-story, 132,600 square foot, steel framed structure. This state-of-the-art [..]

View Project

Bridges

Tokyo Bay (Rainbow) Bridge

Tokyo Bay Bridge is a suspension bridge crossing northern Tokyo Bay between the Shibaura Wharf [..]

View Project

Lab and Science

Integrated Care Center Huntington Beach

Huntington Beach, CA

The new Integrated Care Center was initiated by Hoag Medical Group to create a more [..]

View Project

Save lives, impact economies.