Verily Campus Lab and Office Buildings

Verily Campus Lab and Office Buildings

This project involved designing the exterior Buckle Restrained Braced Frame (BRBF) lateral system for two science lab and office buildings in the heart of what’s now South San Francisco’s booming biotech industry. Projects to date include a 5-story lab and office structure at 259 E. Grand Avenue and a 3-story lab and office structure at 269 E. Grand Avenue. Building 269 included an 84’x30’ atrium and diaphragm, which created a challenge for the design team in connecting the two. The atrium allows natural daylight to accent the building’s sustainable elements. Housing research and development labs with offices, the buildings are now part of a campus that Verily, formerly Google Life Sciences, moved into in 2016. The buildings were formerly occupied by the biotech giant Amgen, Inc. Miyamoto is working on the overall Verily campus expansion, providing engineering services for 279 E. Grand Avenue as well.

Team Members

No data was found

Client

DGA

Year

-

Scale

Building 259 5-story, 163,257-SF Lab/Office Building 269 3-story,
102,616-SF Lab/Office Building 279 6-story, 193,964-SF Lab/Office

Location

South San Francisco, CA

Verily Campus Lab and Office Buildings

This project involved designing the exterior Buckle Restrained Braced Frame (BRBF) lateral system for two science lab and office buildings in the heart of what’s now South San Francisco’s booming biotech industry. Projects to date include a 5-story lab and office structure at 259 E. Grand Avenue and a 3-story lab and office structure at 269 E. Grand Avenue. Building 269 included an 84’x30’ atrium and diaphragm, which created a challenge for the design team in connecting the two. The atrium allows natural daylight to accent the building’s sustainable elements. Housing research and development labs with offices, the buildings are now part of a campus that Verily, formerly Google Life Sciences, moved into in 2016. The buildings were formerly occupied by the biotech giant Amgen, Inc. Miyamoto is working on the overall Verily campus expansion, providing engineering services for 279 E. Grand Avenue as well.

Client

DGA

Year

-

Scale

Building 259 5-story, 163,257-SF Lab/Office Building 269 3-story,
102,616-SF Lab/Office Building 279 6-story, 193,964-SF Lab/Office

Location

South San Francisco, CA

More Projects

Art

Chris Burden “Urban Light”

Los Angeles, CA

The Chris Burden “Urban Light” art installation consists of 202 vintage light posts from Los [..]

View Project

Lab and Science

UCI Biological Sciences Building Unit 3

Irvine, CA

As part of a design-build competition, the Biological Sciences Building Unit 3 is a new [..]

View Project

Seismic Retrofit/Heritage Renovation

Elks Tower Seismic Upgrade

Sacramento, CA

The historic Elks Tower was rehabilitated to accommodate retail space on the first floor and [..]

View Project

Retail

Allen Hyundai Dealership Expansion

Laguna Niguel, CA

Founded by Stanley Allen in 1946, on the Pacific Coast Highway in Laguna Beach, California, [..]

View Project

Commercial, Entertainment

Porsche Driving Experience

Carson, CA

Miyamoto designed a 2-story concrete tilt-up building of 48,025 SF on top of an existing [..]

View Project

Mixed-use, Residential

Riverwalk Mixed Use Phase 1

San Diego, CA

Riverwalk is a 200-acre mixed-use community located in San Diego’s Mission Valley submarket. Set in [..]

View Project

Save lives, impact economies.

We use cookies

We use cookies to improve your experience on this website. You may choose which types of cookies to allow and change your preferences at any time. Disabling cookies may impact your experience on this website. You can learn more by viewing our Cookie Policy.