The scope of services included the structural and infrastructural design of the data center facility. The data center facility was composed of two data centers, one office building and three supporting structures planned within a 25.000-sqm project site. As the equipment used in the data center structures was vital to the operations of the bank, the data center and office buildings were designed with base isolation systems. Operational performance was targeted for the base isolated structures considering a 2475-year return period earthquake to ensure that the facilities can continue operations in the worst-case scenario. The completed tasks also included providing a site-specific seismic hazard analysis (SHA) report, structural health monitoring system (SHMS) configuration and construction supervision on site.

Details

Location
Turkey
Year
2016
Cost
$15 million
Size
20,000 m2