skip to Main Content
Hale Medical Office Building
Hale Medical Office Building
Hale Medical Office Building
Hale Medical Office Building

Hale Medical Center has an interesting story.  Because the Methodist Hospital located in Arcadia, California had an overflow of outpatient clients due to recent changes in federal healthcare legislation, a new building was required. To support this sudden need, Miyamoto International provided structural engineering design services for a four-story, concrete tilt-up medical office building. The 18,000-SF floor plate and 72,000-SF total building are on conventional continuous and isolated concrete pad footings. Miyamoto also provided design services for a steel pedestrian bridge connecting the new medical office building (MOB) to the current Methodist Hospital. This allows patients to quickly access the medical building located across the street.

Seeing a building go up “in days” was a wonder to the community.  A video of how we do this can be seen here.

Market Sector
Healthcare
Location
Arcadia, CA
Completion Date
2012
Cost
$6.2 Million
Size
72,000 SF

×Close search
Ara