skip to Main Content

Miyamoto Turkey undertook the design project of a 300m long breakwater to control the discharge of over flooding coming through the mouth of the stream. The project included the detailed application of the design and technical specification in regard to dredging and breakwater construction.

Location
Istanbul, Turkey
Year
2010
Client
Istanbul Metropolitan Municipality

×Close search
Ara