skip to Main Content

Miyamoto provided design services for a new two-story police station with holding cells, separate parking garage and a vehicle maintenance facility. Confronted with a tight budget in a very unstable construction environment, Miyamoto engineers produced a highly economical structure by making best use of the available design methods and materials. This included the use of precast concrete for the parking garage and a highly efficient design for the police station in order to reduce steel tonnage.

Location
Los Angeles, CA
Year
2008
Client
Perkins and Will
Construction Cost
$30.2 Million
Scale
57,000 SF Facility / 85,600 SF Garage 231 Parking Spaces

×Close search
Ara