Our commitment was the schematic structural design of the new Departures Building at Otopeni Int’l Airport.

Despite the very simple rectangular shape, the structural system of this 3-story building is composed of reinforced concrete frames and concrete cores. The roof is supported by 3-meter high steel beams spanning 43 meters between the concrete columns.

The building was designed with a Performance Based Design concept to withstand a major earthquake action.

Market Sector
Aviation
Location
Bucharest, Romania
Completion Date

2012
Client
C.N.A.I.H.C.B. – National Company “Henri Coanda” International Airport Bucharest
Project Team
General Contractor:
Romairport SA
Architects:
Technital S.p.A.
Engineering:
Technital S.p.A. / Iptana SA
Consultant for Structural Design:
Ing. Pietro Boerio,
Miyamoto International, Milano
Cost
€ 62 million
Size
19,500 M²